Potholes, Other Street Repair
- Case Date:
- 8/4/2025
Coming down fullerton pike to rockport where they are doing construction I turned onto rockport from fullerton and about 100-200 ft down the hill going north I hit a very hard rise from a partial repavement bump in the road causing a very bad impact to my wheels and rims. Now my car shimmes and needs an alignment. How can I report a repair needed to my alignment? Thank you
Kim Lentz Brinegar
Potholes, Other Street Repair
- Case Date:
- 8/3/2025
Re: Ureport case# 204662
Potholes, Other Street Repair
- Case Date:
- 8/9/2025
on North Jackson Street, just north of 9th Street, at entrance to Rev Butler Park, there is an extensive pothole --- and others as you travel north to BLIne crossing.
Potholes, Other Street Repair
- Case Date:
- 8/9/2025
Thank you for repaving of Sixth Street from Rogers to Elm Street. But, the worst part of that street is from Elm to just beyond the roundabout at Oak Street......it is in horrible condition for cars, bicycles or pedestrians. The street truly needs repaving all the way to Adams, but at least get to Oak Street. Thank you
Potholes, Other Street Repair
- Case Date:
- 8/14/2025
I had sent in a request on 5/19/25 Case #202787 reporting that Olive Street needs a concrete curb installed. Due to the excessive rainfall this has caused flooding issues for 1502 S. Olive and the house on the corner of Hillside and Olive (1144 E. Hillside Dr.). I was informed that this was on the paving list and there was plans for an asphalt curb. I called on 6/9/25 and spoke to the Engineering dept. (Iris) about installing a concrete curb instead of asphalt. There is already a partial concrete curb that runs past 1502. It needs to have a concrete curb all the way up the hill so that rain will not flood into the driveway and along the house of 1502, plus it runs past the curb into the yard of 1144 E. Hillside causing flooding in the basement. They have a sump pump now, but it's old and could quit at any time. It's already August and there hasn't been any kind of activity on this street. Do you have an estimated date as to when the street will be paved and the curb installed? Also, there is a construction sign in the yard of 1144 E. Hillside that has been there all summer and would like it to be moved. Thank you for any information you can provide!