closed #192374
Sidewalk & Curb Complaints
11th & Maple
- Case Date:
- 7/22/2024
There is a hole filled with gravel (which is somewhat washed out) in the crosswalk at this location. Appears to he leftover from fiber project
There is a hole filled with gravel (which is somewhat washed out) in the crosswalk at this location. Appears to he leftover from fiber project
Third attempt in a week to get the gravel filled hole in the middle of the crosswalk repaired. Appears to be left over from city fiber project
Core hole in crosswalk from fiber project is filled with loose gravel
large sidewalk gap on Arlington just north of the new roundabout, on the west side, it seems incomplete, or maybe they are going to finish it soon?
The curbs for the new bump-outs on Weatherstone need painted a bright color. It is hard for drivers to see the change in the road, especially at night, and if hit, would cause vehicle damage.
Deep hole (3’) in treeplot next to sidewalk. No protection, no warning. Has been there for over a month. Left by fiber project
Deep hole (3’) in treeplot next to sidewalk. No protection, no warning. Has been there for over a month. Left by fiber project
There is no paved sidewalk; it's just a bunch of horribly laid slabs of stone. How was this even allowed, especially in downtown?! This is not wheelchair accessible, and is dangerous to all others. Please put in a paved sidewalk here so wheelchaired people don't have to turn around and cross the street just to get by.
I would like to request a sidewalk ramp / crossing be installed at the SE corner of Walnut St Pike and Winslow. It looks like there has previously been an accident there and now there is a concrete barricade and guard rail preventing the pedestrians from crossing. So either the pedestrian has to make a somewhat dangerous crossing there, or cross three extra times to go around and back. Thank you! Michelle Giansante
Damaged guardrail on culvert side of street. Can be seen from google maps. I first reported this situation last summer (2016) and was advised city was awaiting contract and materials. I reported it because I feel it could become a safety hazard during the winter months with slick and icy streets.