Sidewalk & Curb Complaints
2661 E 7th ST
- Case Date:
- 3/13/2024
Can the sidewalk at xxx East 7th Street be shaved down to eliminate the height difference between the two adjoining slabs? See photo attached. This height difference can be dangerous for westbound cyclists riding on the sidewalk who need to negotiate both a quick right turn and a left turn to enter the SR46 underpass. Now that an asphalt multi-use path has been built at Relato Bloomington at the intersection of Pete Ellis Drive and Longview Avenue, westbound cyclists are more apt to ride on the path/sidewalk vs. the street, and will continue to ride on the sidewalk all the way to the underpass. Cyclists will be going at speed since it is downhill westbound. To negotiate this sidewalk height disparity, while at the same time negotiating a sweeping turn, poses a dangerous situation that can be easily eliminated.
Sidewalk & Curb Complaints
213 S Jackson ST
- Case Date:
- 5/29/2024
Hello,
I am writing to inquire about whether the sidewalk on the east side of S. Jackson St. between 3rd and 4th streets can be repaired. As a person with a visual impairment, I have a terrible time walking on the sidewalk in this location, which is in the block where my house is. The sidewalk is very uneven, with tripping hazards throughout its course due to decay. If I didn't have a visual impairment, it would certainly be easier to walk on this part of the sidewalk, but I know that others with no visual impairment also have a difficult time because of the deteriorated surface.
Thank you.
Sidewalk & Curb Complaints
2014 S Georgetown RD
- Case Date:
- 6/26/2024
Sidewalk raised. Weeds and grass growing
Sidewalk & Curb Complaints
145 E 17th St
- Case Date:
- 7/30/2024
Deep hole (3’) in treeplot next to sidewalk. No protection, no warning. Has been there for over a month. Left by fiber project
Sidewalk & Curb Complaints
145 E 17th St
- Case Date:
- 7/31/2024
Deep hole (3’) in treeplot next to sidewalk. No protection, no warning. Has been there for over a month. Left by fiber project
Sidewalk & Curb Complaints
1434 E 3rd ST
- Case Date:
- 4/9/2024
broken sidewalk 1430 E 3rd street
Sidewalk & Curb Complaints
1115 E Wylie ST
- Case Date:
- 5/15/2024
broken sidewalk and missing curb
Sidewalk & Curb Complaints
1007 E Sheridan DR
- Case Date:
- 5/25/2024
Thank you for patching the cut in the sidewalk, but now instead of a small trench it's a bump. Please patch sidewalks to be flat. (southwest corner at Southdowns/Woodlawn intersection).
Sidewalk & Curb Complaints
- Case Date:
- 3/18/2024
AEG is installing fiber in my neighborhood and they have been putting their heavy trucks and boring machine on the sidewalk. The sidewalk from 14th to 17th on the west side of Rogers was already all cracked up from age but this is the straw that breaks the camels back. It is definitely much worse than it was a week ago, over almost the entire length. I want to make sure the homeowners aren't held responsible for this damage. It would have lasted years more without heavy trucks on it but now its decidedly concave and will almost certainly start giving up big chunks in the next winter.
Sidewalk & Curb Complaints
- Case Date:
- 4/24/2024
The orange barriers along the sidewalk on S High Street between Wimbleton and E Meadowbluff Ct still have not been removed and remain a big eyesore. I was told that Duke Energy needs to do something there before they can be removed. I bet it has been 2 years now that those barriers have been there. Isn't it time that Duke did what they need to do in order for them to be removed?!