closed #166385
Sidewalk & Curb Complaints
1633 S Pinestone CT
- Case Date:
- 10/31/2018
Sidewalk is completely blocked from downed tree since October 21st.
Sidewalk is completely blocked from downed tree since October 21st.
The sidewalk in front of my house is crushed. The section north of my driveway and south are both heaved and crushed making it hard to shovel
block wall is falling onto sidewalk reported from Mrs. Beazer 334-2262
The transitions between the sidewalks and street level on both sides of this intersection are in very poor condition. Part of the road is washing away and it makes getting a stroller or bike over these transitions very difficult. Please repair these or resurface the road to make it easier to use the sidewalks. My kids have fallen here many times due to the uneven conditions.
The driveway apron is in disrepair. It looks like the city had paved this area at one point in time, but it has started breaking apart. Is this something the city would take care of, or is it the homeowner's responsibility? Please let me know either way. Thanks!
sidewalk bridge handrail top pieces are loose - at least 2 dozen screws have rusted out. please replace with galvanized screws.
I live in Stier Park at the intersection of Hillside & High Street. Over the last year or two many of the sidewalks have been repaired or made compliant. However, this section between Nancy and High Street has deteriorated to the point of gravel. I believe there are other repairs happening in our general area so would love if this section could also be repaired soon. I will gladly provide a photo. I have attempted attaching a photo multiple times but the form never completes the submission process with a photo attached. Thank you.
Need new bold white block crosswalk markings painted on street. This is a bus stop, near a park with lots of children. Cars rarely come to a complete stop and often run this stop sign. I requested this earlier this year and it was never completed.
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.
The roadway has been built up quite a bit in front of our house at 2006 S Sussex, resulting in a significant dip between the street and our driveway. This is causing the bottom of the cars to scrape when entering and exiting. Surrounding houses have had blacktop poured into this area to level out the connection. Could we have that done too please?