Graffiti
Zahradnická 3–21
- Case Date:
- 10/24/2012
- Case Date:
- 6/18/2013
Tag on b-line side of the o the building.
Graffiti
McDoel Greenway Corridor
- Case Date:
- 5/28/2013
Graffiti
McDoel Greenway Corridor
- Case Date:
- 6/25/2013
Graffiti
McDoel Greenway Corridor
- Case Date:
- 6/25/2013
Graffiti
McDoel Greenway Corridor
- Case Date:
- 7/3/2013
Tag on the B-line side of loading ramp.
Graffiti
McDoel Greenway Corridor
- Case Date:
- 9/18/2013
Tag on the B-line side of the convention center loading ramp.
Graffiti
Indiana University, Bloomington
- Case Date:
- 6/2/2014
Tag on sidewalk
Graffiti
Indiana University
- Case Date:
- 8/30/2020
Improper language chalked on Kirkwood Avenue in front of Bicycle Garage. Four letter word (FU&k)
Graffiti
Bloomington Rail Trail
- Case Date:
- 12/20/2011
graffiti on trail.