uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (22)

closed #173300

City Performance

121 S Smith RD

Case Date:
8/8/2020

Submitted a report but didn't show up in the system? Someone is going to die, likely multiple, if changes aren't made to Smith and 3rd. New 3rd by the State is great but has caused something to change with the Smith traffic. Left turners are hesitating backing up traffic (no big deal) but they are hesitating because cars behind them are zipping around going straight while folks are trying to wait and turn. Meaning the folks can't turn safely, and when they do POW crashes like tonight at 7 pm happen. Please do a traffic study and coordinate with the State for immediate safety improvement. Please do not punt this to the State, but be involved, as Bloomingtonions are going to die; forget traffic, this is about safety. Ideally there needs to be a left turn green arrow only and then a straight signal but that may need lanes. So I don't know the solution, but cars zipping around hitting left turners, etc. is NOT sustainble.

closed #200157

City Performance

2001 E Viva DR

Case Date:
1/13/2025

The crews that installed the digital fiber in front of my house cut down some small trees, but didn't haul away the branches. The chipper truck came through and picked up tree debris from other yards, but not from mine. Can it still be picked up?

closed #192730

City Performance

2057 E Cheyanne LN

Case Date:
8/6/2024

Hi there, I wasn't sure what section to file this complaint under, since it is related to a loud construction project that has been ongoing on High street for several weeks. There was no major issue up until today, August 6. It is now almost 10:30 PM and the construction has not finished for the night. There is a loud machine (a pump, maybe?) that has continually run since about 8:30 pm and is showing no sign of stopping. We have small kids who are sensitive to noise, and we live right next to the construction. I understand the workers have to complete their task, but to go this late at night seems disruptive to folks in the area. Thanks.

closed #172281

City Performance

320 W 8th ST

Case Date:
4/22/2020

I knew Longview and Pete Ellis were getting some apartments built in that lot, but apparently it is going to be more than usually allowed? I am SUPER concerned that you're going to be packing extra students (almost all will have cars) on a road that is NOT designed for heavy traffic but SUPPOSEDLY a bike path for bikes. It might be great, but what are the extra precautions taking place to ensure students zipping in and out won't disrupt the greenway and kill cyclists? Hoping some will be cyclists, but realistically there is going to be a lot of in and out speedy traffic there for what was a very calm road fantastic for biking. Want to make sure it's not overlooked. Also, anything big built east of College is going to experience major backup on rush hour times at College and 3rd. I know it's a state intersection but the city needs to look into it and factor in the ability of that intersection to take on more traffic. Something needs to change there. It literally clogs (outside of a pandemic) constantly with left turn traffic from 3rd turning south to College, which block eastbound 3rd street. Time and again. Part of the problem is it clogs at the next light (the city's I would imagine) by Fazoli's as the lights aren't coordinated well if at all. So two concerns: not a bad place to live, including for students - way better than century village hotel, but make sure the bike path remains safe! This can't be presumed. That area will change big time and cyclists need reassurance. And 2) light at 3rd and College is going to be negatively impacted and timing or something needs to be looked at there. The east/west greenway I was hoping was going to be getting ENHANCEMENTS in the next year or two, not becoming a motorist highway :( Thank you.

closed #202684

City Performance

3811 E Morningside DR

Case Date:
5/14/2025

Crews are there putting in sidewalks they said we never got in notice about this I am the manager for this property. Please give us a detail letter of what will be taking place and the timeline please. This is in front of Yorktown Courts

closed #201287

City Performance

417 N Elm St

Case Date:
3/3/2025

The fiber crews were on our street and parked heavy machinery in my parking lot, they punctured a hole in my asphalt and scratched the concrete of my green space.

closed #148989

City Performance

612 N Washington ST

Case Date:
10/9/2015

Trash all over porch 612 n Washington

closed #201981

City Performance

700 S Eastside Drive

Case Date:
4/9/2025

The fiber optic cable pit at 700 S Eastside Drive (right next to the No Parking Any time sign) is missing its (green?) cover, so now there is a big hole in the grass. I think it was blown off by a recent storm.

closed #174036

City Performance

W 17th St, Bloomington, IN 47404, USA

Case Date:
11/1/2020

Why has the construction project on West 17th not been completed? Don't tell me it is behind schedule. I want specifics.

closed #161401

City Performance

Case Date:
10/3/2017

a few weeks ago i wrote on ureport about the missing crosswalk button device at the intersection of west 3rd street & franklin. later when i looked at ureport again i could see that a city engineer had contacted the i-69 project to tell them it was their problem. it still didn't get fixed, so i called the phone # for 1-69 & left a voice message. a man from there called me back & said that their project doesn't go that far, so it's up to the city to fix that. his name is kirk roth so if there is still a dispute, please call him at the phone# on their website. this needs to get resolved please for pedestrian safety at a very busy intersection. people who live on yancy etc need to cross there to get to the bus-stop across the street to go to work. thanks