closed #155986
Trails
- Case Date:
- 9/19/2016
Graffiti on the connector path from B-Line to 9th St Park trail.
Graffiti on the connector path from B-Line to 9th St Park trail.
Bathroom at church lane trail parking. Door does not latch closed.
overgrowth of algae on church lane bridge at end of clear creek trail.
hose on pump needs replaced-someone cut it:(
3rd muller camp
Tree down south of country club drive on the rails to trails.
Enjoying the new(-ish) paving on the trails at Winslow SportsPlex and YMCA! Bloomington rocks!!!
Wood bridges on trail at RCA park are about to collapse.
Portapotty at Tapp Rd on the Clear Creek Trail needs TP and is almost full
Two trees are down on the Rails to Trail. They are down on the dirt part of the track.