closed #185130
Trails
3401 W Wapehani RD
- Case Date:
- 8/21/2023
there is a broken board on a bridge on south side of park.
there is a broken board on a bridge on south side of park.
The middle trail with bridge across main creek is really over grown, very difficult to walk let alone ride.
Large trees fell across trails in multiple places, west side near highway, east side not far from parking lot.
I'm not sure this is encroachment on the Rail Trail but it's fairly close. This is about .5 mile south of Tapp Rd.
The B-Line trail section from 1st Street to 4th Street is deteriorating because tree roots are breaking the pavement. It needs to be resurfaced.
We encountered a group of homeless men in the rail trail around 12:30 today. They had their belongings scattered around the trail and we felt threatened by them. We did turn back towards the parking area and continued towards Switchyard. As a senior, we feel our safety at risk Can you please contact someone to get the area cleaned up?? We haven’t been to that trail for a while and we’re disappointed to see the mess Thanks
A tree is down across the trail between the roundabout and Victor, closer to Victor. There’s another one further north partly across the trail.
The pavement on the B-Line Trail is buckled in several places, especially between 2d & 3d Sts. I thought this would be corrected when warm weather came, but it's now 95 degrees and it hasn't been fixed. Someone needs to flatten the bumps. It would be easy on a day like this.
Broken wooden bridge with tree limbs sticking out at Bryan Park central path
Following up on #184608: The rotted boards have completely given way. There is now a massive hole in the boardwalk.