open #186193
Utilities Construction
- Case Date:
- 11/2/2023
The folks installing the fiber optic have severed what seems to be the main water line on the North side of Etter Drive, at about 6:30 pm, Thursday Nov 2. Water is gushing above the street, and beginning to flood lots.