uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (35)

closed #174227

Utilities Construction

Case Date:
11/29/2020

Open manhole cover about half block south of Mortan and 11th, west side of road

closed #184316

Utilities Construction

Case Date:
6/24/2023

water meter cover (??) missing on sidewalk on the west side of college, just north of the train bridge (about a block south of 14th st). trip hazard. not sure if it was removed for construction or what but it's been gone for about a month. thanks!

closed #185662

Utilities Construction

Case Date:
9/19/2023

Cbu replaced 3 hydrants during main replacement. These areas need to be replanted . Additionally during one replacement irrigation damage resulted in a $400 charge for repair. We request reimbursement

closed #186590

Utilities Construction

Case Date:
12/21/2023

900 and 1000 block South High Street Water running down the street, where fiber optic cable is being installed

open #188861

Utilities Construction

Case Date:
6/10/2024

I work for Mackie Properties, and we manage Ridgefield HOA. The driveway at 3916 N Whitewood Way in Ridgefield, which the City repoured last year after repairing a broken main water line, is deteriorating. We initially reported this issue to the City earlier this year, but the City did not take responsibility for redoing the driveway. Since then, we have had contractors assess the situation, and they have determined that improper installation is causing the deterioration. Today, we sent another contractor to reinspect the driveway and provide a quote for sealing it. However, they confirmed that the deterioration has worsened over the past few months and that sealing is not a viable solution. They noted that the concrete was too wet when installed, leading to its current state. We request that the City tear out the existing driveway and properly pour a new one to prevent further deterioration.