Biking & Walking
913 N Walnut ST
- Case Date:
- 3/16/2015
The sidewalk along the west side of Walnut street between the train tracks and the CVS is in bad shape. There are some large pieces of concrete that have come loose and have created several large tripping hazards.
Biking & Walking
801 N Lincoln ST
- Case Date:
- 2/16/2015
Sidewalk on west side of Lincoln, just north of 11th is below street grade and floods every time it rains.
Biking & Walking
800 N Washington ST
- Case Date:
- 7/29/2014
Sidewalks along North Washington Street are in need or repair; there are sections that are lower than the street w/ no curbing and sections that have crumbled down to th gravel. Sections in question between 12th and Cottage Grove.
Biking & Walking
411 N Washington ST
- Case Date:
- 11/21/2014
Could the sidewalk here be improved to be ADA compliant? Thanks!
Biking & Walking
408 1/2 E 4th ST
- Case Date:
- 8/14/2024
Along East 4th Street in front of the delicious restaurant Dat's. There are many bricks that could pose a danger to pedestrians.
Biking & Walking
401 N Morton ST
- Case Date:
- 8/10/2024
Walk light at 3rd and eagleson. Is not functioning. Northeast to southeast walk light does not come on.
Biking & Walking
400 E 7th ST
- Case Date:
- 8/27/2024
Debris and broken-glass throughout the length of 7St bike lane needs to be swept up. This should happen every Sat morning after the bar-hopping.
Biking & Walking
313 1/2 N Grant ST
- Case Date:
- 3/13/2015
Intersection of 7th & Grant streets filled with broken glass; can a street sweeper clean this up please?
Biking & Walking
201 W 17th ST
- Case Date:
- 7/28/2018
The green painted "bike box" and bike lane entering it are full of gravel and debris. It on the east bound lane of 7th Street just west of College - at the light for 7th.
Biking & Walking
1415 E 3rd ST
- Case Date:
- 3/14/2018
I think it is now more than three years since there have been proper crosswalks for pedestrians crossing Third Street at the Jordan Avenue intersection. It is more than two years since the first time I wrote to inquire about it (March 2016). I was told then that it would be done in the summer of 2016. I wrote again in early 2017, and was told it would be done in the spring of 2017. A friend of mine wrote in the summer of 2017 and was told it would be done in the fall. What the heck is going on? After the recent work at Third and Woodscrest, new crosswalks appeared immediately. For it to take years at a corner where the pedestrian traffic is much higher seems truly unconscionable.