closed #163246
Biking & Walking
- Case Date:
- 2/20/2018
A woman called the OOTM to report that the construction fencing at 3rd and College on West Side is coming apart and flapping.
A woman called the OOTM to report that the construction fencing at 3rd and College on West Side is coming apart and flapping.
Can we get the painted bicycles on the road again soon in Park Ridge East. Hoping they slow traffic a bit and have people look out for the bikes on the bike friendly road. Sooner the better. Thanks!
Hello: Recently visited Bloomington (IU grads) and noticed the street lights on the B-Line Walking trail. I am involved with our neighborhood association and would like the manufacturer/ supplier info if possible. Appreciate any assistance. Love B-Town! Rich Schamerloh
The sidewalk in front of the dentist office at 221 east 7th street has a speed bump across it where the parking lot connects to 7th street. This is a tripping hazard for pedestrians.
The city has build the B-Link trail from Henderson to Walnut. But how do I get to Henderson? Are there any plans for a bike/pedestrian trail from Thornton and Huntington to Thornton and and Troy Court. On Google maps, it looks like there is a right of way there. Creating that bike path would extend the unofficial Arden/Thornton greenway to create an east west corridor from Southeast Park to the B-line.
Good job of snow removal and de-icing on the Allen-Covenanter Greenway and the B-line this winter. Hopefully we can find funding to de-ice all of the side paths around town in future, but this is a good start!
Clear creek trail from church lane to Tapp road in bad shape from high wind. Trash from tree limbs. I was not able to ride bike on Wednesday till I walked trail removing limbs. Still lots of small stuff. Needs cleaning very bad. Thanks
The construction project at 2044 South Hawksmoore Drive has left the sidewalk covered in a layer of mud now for the past several weeks. It would be nice if there was a requirement for erosion control along the sidewalk to keep it in a passable state.
There's a missing board in the wooden bridge/walkway between Windingbrook and S. High School near Childs School.
Was any consideration given before closing all 4 corners of the Washington and 10th intersection to pedestrian traffic?