uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (15)

closed #156442

Biking & Walking

820-898 North College Avenue

Case Date:
10/7/2016

Debris in the bike lane on collegr from 14th south to the train bridge. In particular, signifixant chunks of the concrete bridge are flaking off and landing in the bike lane.

closed #144082

Biking & Walking

820-898 N College Ave

Case Date:
3/16/2015

Under the train bridge on N College, there is more than an inch of sand in the bike lane. It is effectively impassable by street bike.

closed #152479

Biking & Walking

523 E University ST

Case Date:
4/24/2016

broken glass from beer bottles

closed #158886

Biking & Walking

401 S Swain AVE

Case Date:
4/25/2017

sand and gravel in road. very dangerous for bicycles to turn here. please send street sweeper.

closed #145437

Biking & Walking

2222 E Covenanter DR

Case Date:
5/31/2015

Raised gutter lip at this corner caused a cyclist to crash. He was riding close to the edge for a car to pass.

closed #141449

Biking & Walking

2153-2177 S Bent Tree Dr

Case Date:
9/28/2014

sign for bike path hit by car, leaving the bike path sign bent into trees. isn't terrible, but figured it's worth fixing

closed #146821

Biking & Walking

208-298 S Adams St

Case Date:
7/31/2015

shattered remains of a cabinet or something are completely blocking the westbound bike lane.

closed #132899

Biking & Walking

1854-1898 N College Ave

Case Date:
7/21/2013

Lots of debris in the bike lane along College Ave between the bypass and bridge

closed #158190

Biking & Walking

1296-1298 East 10th Street

Case Date:
2/20/2017

The walk sign was NOT on to cross tenth, as pictured, though the speaker on the button said it was. To duplicate the problem you may have to wait ten or so seconds into the cycle.

closed #180934

Biking & Walking

Case Date:
8/8/2022

bridge over train tracks where rogers turns into madison (about 800ft north of 11th&rogers). NB bike lane (on east side of rogers) merge zone was inadvertently removed with new paint. originally, there was a merge zone (dashed white line) where the bike lane ends. when the bridge was resurfaced last year, they got the merge zone correct but added an extraneous solid white line north of the merge zone. when they repainted, they simply made the whole thing a solid white line. the current spot where the bike lane appears to end is a dangerous spot to merge. even with the striped line in the right place, this was an uncomfortable merge. it needs to be improved, not harmed. thanks!