closed #179694
Biking & Walking
911 N College AVE
- Case Date:
- 4/30/2022
There is significant debris and gravel in the bike lane under the rail bridge around 11th St and College Ave
There is significant debris and gravel in the bike lane under the rail bridge around 11th St and College Ave
Trail along South Sare from approximately Canada dr south to Jackson Creek middle school crossing is very overgrown and needs mowed. This is a yearly occurance, also please maintain through out year. Thanks
There is a lot of broken glass on the multi-use trail on the north side of Winslow near the Henderson Court apartments.
The crosswalks across E Maxwell Lane in between Henderson and Woodlawn are all quite faint- especially in comparison to the new crosswalk at Mitchell and Maxwell Lane. Cars do not stop because I do not think they know they are crosswalks. Can these please be repainted brighly with reflective white paint?
In the bike lane on the east side of Kingston near the old Marsh store, there is a large piece of what looks like fiberglass insulation over the storm grate blocking both the grate and the bike lane. Thanks for checking on it!
The sidewalks on Sare Road between Spicewood (as of the morning of 6/4/24) and the roundabout on Winslow have brush that is overgrown to the point that is narrows the sidewalk down so much that only 1 person can walk through. There are also thorn bushes that will scratch you if you meet someone at the same time either walking, running or biking. The sidewalk is also overgrown from the roundabout at the top of the hill on Winslow down to the roundabout at the Jackson Creek trail and then up High Street. These sidewalks are used a lot but the efficiency is greatly diminished since much of it is interrupted by brush. I'm not sure if this is the city's or the property owner's responsibility but it would be great if this could be addressed. Thank you.
The pedestrian crossing sign in the middle of the road is missing.
I don't know if the city government was involved or not but thank you if so if involved with the sidewalk replacement at Eastplex. Awesome!
This problem remains. I cannot see the remediation. See photo of site and ticket.
Please, would you replace the flexi-post on the 7-Line on the east side of Walnut next to La Una Cantina? The IU residential calendar has early arrivals starting August 2nd, so I think it would be a good idea to get it replaced before then. Thank you!