Biking & Walking
1601 S Rogers St, Bloomington, IN 47403, USA
- Case Date:
- 11/8/2022
Would it be possible to have a crosswalk painted on South Rogers Street at the entrance to the parking lot of Switchyard Park? Thank you for your consideration.
Biking & Walking
1609 S Rogers ST
- Case Date:
- 6/9/2021
I'd like to request a crosswalk or something to make it safer/easier for pedestrians & bicyclists to cross Rogers over to the Switchyard Park.
Biking & Walking
1635 N College AVE
- Case Date:
- 8/20/2023
There is significant debris – sand and gravel – strewn across the bicycle lane in several places on North College Avenue. The debris has been there for MONTHS. The debris is very hazardous to bicyclists, especially because it is so thick and extensive. Bicyclists avoiding the debris or sliding on the debris could be struck and killed by motor vehicles – especially given that the City utterly fails to enforce the speed limit, which means that drivers have less time to react. The area with these piles of debris extends for almost the entire length of Miller Showers Park.
Biking & Walking
1715 S Walnut St, Bloomington, IN 47401, USA
- Case Date:
- 5/30/2023
There is a pedestrian activated crossing from the Switchyard park over to the B-Link Trail on South Walnut. Activating the signal triggers a red light for traffic on South Walnut, but I constantly have issues here with traffic blowing through the red light, often at high speeds.
Is there anything that can be done to make this crossing safer for pedestrians and cyclists?
Biking & Walking
1717 S Walnut ST
- Case Date:
- 4/22/2020
Are there any plans to put a ramp down from the bike lane down to street level here? This is the newish bike lane that runs behind Black Lumber, and should lead into the Switchyard Park. At the Walnut St crossing there is still a curb here, making the transition to the road difficult for bikes.
Biking & Walking
1903 S Locust CT
- Case Date:
- 9/23/2021
The sidewalk closed signs have been removed from the new pathway on High Street, yet the new driveways that were poured are several inches higher than the pathway. This is a significant hazard for pedestrians, and bikers.
Biking & Walking
1930 E 7th ST
- Case Date:
- 2/23/2023
This street is part of the 7 line and yet doesn’t have any traffic demarcation. Needs lane/yellow lines and white bike symbols. This was needed 4 years
ago. They are completely gone now leading people to believe it is a one way street. This street (all of 7th, on campus) is part of the city’s green initiative and alternative transportation effort. thanks!
Biking & Walking
200 N Walnut ST
- Case Date:
- 12/1/2020
Eastbound walk light on north side of 6th, crossing walnut, has been out for weeks. The Don’t Walk is OK
Biking & Walking
200 S Madison ST
- Case Date:
- 11/3/2020
Street light along Madison between 3rd and 4th is flickering and has been for the past week
Biking & Walking
200 S Washington ST
- Case Date:
- 2/8/2024
Hello!
It's been a few weeks with no cars blocking the bike lane on my commute! Which has been awesome. Not sure if you all have actually tried to do something about it, or if it's just coincidence, but it's been nice.
However, there was a car blocking the bike lane on Washington between 4th and 3rd St's tonight 2/8/24 at 6:07pm MI plate: DF 04369
Thanks!