uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (12)

closed #185623

Biking & Walking

1411 N Kinser PIKE

Case Date:
9/16/2023

Kinser Pike road and sidewalks have been destroyed for a long time now after the construction at 17th and Kinser. These should have been repaired right after the gas line construction. Do bad this isn't the Eastside or IU as you all would've had it repaired the next day

closed #186222

Biking & Walking

121 N Pete Ellis Dr, Bloomington, IN 47408, USA

Case Date:
11/6/2023

There are some new safety concerns since the "Relato" building opened next to the multi-use path between Pete Ellis and the bypass on 7th Street. First, there's a conflict point where the garage exits to 7th street. Cars are already pulling quickly across the path towards the street, while bike traffic doesn't necessarily slow for the blind corner of the garage exit either. I've included a photo of a location where this is handled better. This is from the new development on the old K-Mart lot which also has a garage that immediately crosses a bike path. At that location, green boxes with white chevrons appear where the bike and car traffic cross, indicating to both parties that it's a conflict point. ------ The second safety concern is where the multi-use path takes right-angle turn around the corner of the Relato. This used to be an empty field with great sight lines and now those sight lines are blocked. At this corner I have already seen what could have been a couple near collisions due to the shortened sight lines. A treatment that could help here would be what was done at the right angle turn going into the bypass underpass tunnel-- Add a solid center line going around the corner to indicate that parties in both directions should stay in their lane going around the corner. I feel that treatment has made the underpass corner safer and I think it would help signal safer behavior here, too. Thanks!