Sidewalk Requests
3391 S Burks CT
- Case Date:
- 4/28/2023
Sidewalks needed on Walnut St. Pike between Winslow and Rhorer Rd. There are brief stretches of sidewalk on different sides of the road, forcing pedestrians to choose between making a dangerous street crossing to stay on a sidewalk or to walk in a ditch. Winslow and Rhorer are both pedestrian heavy areas. This issue will only get worse when the new subdivision is built.
Sidewalk Requests
3850 S Walnut Street PIKE
- Case Date:
- 3/9/2021
Resident expresses concerns about lack of sidewalks near senior housing facilities on Walnut Street Pike near Rhorer Road, would like to speak with a staff member about potential installation of a new sidewalk.
Sidewalk Requests
3850 S Walnut Street PIKE
- Case Date:
- 6/10/2022
On the east side of S. Walnut Pike north of Rhorer Rd there is no sidewalk between the newly installed county walk (as part of the intersection improvement) and the Peppergrass development. The bank along the road in the area is steep requiring one to walk in the street where the visibility is not great.
Sidewalk Requests
3901 E Fenbrook LN
- Case Date:
- 6/28/2022
There needs to be a safe pedestrian crossing over Smith at this intersection