Blocked Sidewalk
201-249 West 8th Street
- Case Date:
- 6/2/2017
Sidewalk closed for construction with no alternative. mutcd 6d-1 "pedestrians should be provided with safe, convenient travel path that replicates as nearly as possible the most desirable characteristics of sidewalks". On college, the most desirable characteristic is not crossing college!!!!! This is the context where a quality detour is *more* important than in more walkable settings, but staff has mistakenly determined the exact opposite.
Blocked Sidewalk
111 N Dunn ST
- Case Date:
- 6/2/2017
Thursday, the bbc construction site was not blocking the west sidewalk on dunn for the first time in weeks. Friday, they are blocking it again
Blocked Sidewalk
151-199 North Dunn Street
- Case Date:
- 5/31/2017
Bbc building construction is still blocking west sidewalk on dunn w multiple pieces of heavy equipment and vans
Blocked Sidewalk
South Weatherstone Lane
- Case Date:
- 5/26/2017
Overhanging branch and downed branch block sidewalk
Blocked Sidewalk
111 N Dunn ST
- Case Date:
- 5/26/2017
They're blocking the sidewalk detour on the west side of Dunn at the bbc construction site again.
Blocked Sidewalk
114 E 1st ST
- Case Date:
- 5/22/2017
Vegetation near driveway obstructed sidewalk
Blocked Sidewalk
109 E 1st ST
- Case Date:
- 5/22/2017
Vegetation by driveway obstructs sidewalk
Blocked Sidewalk
816 E University ST
- Case Date:
- 5/21/2017
Vegetation obstructing sidewalk
Blocked Sidewalk
151-199 North Dunn Street
- Case Date:
- 4/12/2017
The old Bloomington bagel co building has a construction site that has been blocking the sidewalk for weeks...i beams, concrete trucks, saw horses in front of the entrance of 420. Not even trying to keep it open.
Blocked Sidewalk
267 W 11th ST
- Case Date:
- 4/5/2017
Sign abandoned after cbu construction acouple weeks ago at 11th & college is blocking sidewalk on south side of 11th just west of college