uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (2)

open #204591

Utility Construction Projects

100 N Morton St

Case Date:
7/30/2025

There are steel cables attached to limestone blocks at this location, intended to prevent unauthorized parking. However, these cables are not clearly visible at night or at dusk. Unfortunately, a family member fell over one of the cables yesterday evening and sustained a head injury requiring medical treatment. Given the lack of visibility and the safety risk these cables pose, I respectfully request that steps be taken to either improve their visibility or implement a safer alternative to prevent further incidents.

open #204424

Utility Construction Projects

2591 S Walnut Street Pike

Case Date:
7/23/2025

The contractor doing underground work (fiber?) left a bunch of loose soil along the west side of Walnut St Pike. They came back and seeded and strawed some mother areas but not this.