closed #156808
Sidewalk Requests
- Case Date:
- 10/29/2016
Missing segment between Gourley and existing sidewalk that goes to College Ave. Today I have to take my chair into the he motorway with monster concrete truck traffic.
Missing segment between Gourley and existing sidewalk that goes to College Ave. Today I have to take my chair into the he motorway with monster concrete truck traffic.
I'm trying out a new category since no one reads the other ones I've used. Every time i walk here i have to walk in the street for half a block because people park on the sidewalk (partly because hoosier workwear had concrete blocks that force cars onto the sidewalk)
The side ends for a period. There is not a sidewalk on either side. Please fix.
Why was a ramp not installed on this brand new sidewalk?!?
Requesting a sidewalk connecting the Arlington pedestrian crossing overpass with the sidewalk along Gourley Pike West of Kinser Pike. The blind curve on Gourley Pike on this route makes it especially hazardous for me in my power wheelchair given my need to operate clear of the roadway edge due to rollover hazard and inability to yield to oncoming traffic by exiting the motorway.
CBU removed portion of sidewalk to fix water line. Sidewalk never repaired.
No sidewalk on my side of street. Kids play in road.
Would like the sidewalk to connect walnut at pike and rhorer rd so that nearby residents can easily walk to Kroger.
Growth of trees next to sidewalk has created numerous breaks in sidewalk alignment rendering it unsuitable from Kinser to Arlington School. I trimmed growth near Kinser end blocks sidewalk.
There are two, 2-inch differentials in sidewalk surfaces in front of the fountain in front of city hall. One is near the north end of the fountain hardscaping near the bike rack, the other is on the south end of the fountain hardscaping. The need to be planed down. They are a tripping hazard. I saw a woman trip on the north one at farmers' market this morning, and I tripped on the south one last week. Thanks!