closed #130397
Street Snow Removal
Regimiento 65 Infanteria
- Case Date:
- 1/24/2013
Traffic signals northbound on Henderson at Atwater and 3rd st are badly out of sync. It's a busy commuting corridor. Thanks.
damaged sign on BLine
poorly repaired pothole - part is mounded above surface while hole has sunken below
There's about 50' of my front yard torn up because one of the County plows ran off the road and got stuck this morning. The other plow got him out, but there are ruts over 12" deep that someone will need to repair. Oh, and I've already shoveled myself out of my driveway (where a lot of this was pushed and left).
This was taken at 4:59pm... It seems rediculous and even rude to choose rush hour to block the ONLY east-west road that isn't crippled by construction. The driving situation is bad enough as it is- can't this kind of work be done in non-peak hour traffic?
The timing on these lights are all wrong and you need to delay drivers on Kimble longer during peak travel!
Glass shattered in bike lane