closed #146697
Traffic Related Complaints
State Road 46
- Case Date:
- 7/24/2015
Gravel all over road. I wrecked there last year on my motorcycle. It is still a mess and needs to be cleaned up.
Gravel all over road. I wrecked there last year on my motorcycle. It is still a mess and needs to be cleaned up.
Lights have been updated with sensors but the light from Curry Pike to 46 is green for much too long now. This causes a long backup in the turn lane from 46 W onto Curry Pike.
Lights have been updated with sensors but the light from Curry Pike to 46 is green for much too long now. This causes a long backup in the turn lane from 46 W onto Curry Pike.
Left turn lanes from Westbound 3rd street onto Southbound College Mall Road. When turning left onto Southbound College Mall Road, traffic often gets stuck blocking Eastbound 3rd Street traffic because the light at the entrance to Eastland Plaza turns red. Cars turning left at the green arrow end up stuck in the intersection even if they turn when the arrow is green.
Timing of left turn traffic light allows cars turning left onto south college off of 3rd at bypass to totally block cars heading east at 3rd and bypass sometimes or entire signal cycle. The backup is traffic light at east land plaza near Fazolis.Many cars honk, Veer into other traffic lanes, dangerous "adjustments"yelling etc.
Timing of turn signal from westbound lane to south College Mall
Left/passing lane green light was out on my way to work this morning, ~8:20am
Multiuse Path/Sidewalk covered with low hanging branches and berries all over the path. South of Railroad tracks, north of Eastgate Lane, on west side of 46. Difficult and messy for pedestrians and especially cyclists.
The vines and a mulberry tree have blocked out at least half of the multi-use path on the west side of the Bypass just south of the railroad tracks. This has made it difficult for cyclists and pedestrians to pass.
There was a utility project in the Spicewood subdivision over the winter. The streets through the neighborhood have been severely damaged. I looked on the city paving schedule and did not see a project listed to fix the damage that was caused by the project. Is the city coming back to fix the roads? It's huge eyesore and really poor patching jobs for the damage that was done.