uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (188)

closed #164459

Street Lights

1210 W 8th ST

Case Date:
5/17/2018

Street light on south side of cul-de-sac is out.

closed #164138

Potholes, Other Street Repair

525 E 4th ST

Case Date:
4/24/2018

There is a fairly sizable pothole on 4th Street a bit west of Indiana Avenue (probably something like 30-60 feet west of Indiana Avenue, based on memory and a guess).

closed #164033

Traffic Signals

118 E 7th ST

Case Date:
4/12/2018

The 'do not walk' light on the southeast corner of 7th and Walnut is burned out.

closed #164022

Traffic Related Complaints

2709 E 10th ST

Case Date:
4/12/2018

The bypass has been very congested as of late. It has been taking an extremely long time to drive from 10th & Bypass to highway 37. This has never been an issue before and there can't be that many more people coming to and from Bloomington. It seems maybe the lights are off since law enforcement change the lights for traffic flow after athletic events. Please advise. Thank you!

closed #163985

Potholes, Other Street Repair

4005 N Hinkle RD

Case Date:
4/10/2018

All of Brummetts Creek Road is covered in large potholes, some on dangerous blind curves

closed #163767

Potholes, Other Street Repair

506 W 16th ST

Case Date:
3/28/2018

Massive pothole in eastbound lane. Caused damage to my vehicle.

closed #163684

Potholes, Other Street Repair

526 N Morton ST

Case Date:
3/23/2018

Severe potholes in the alley between the Farmer House and the Woodburn house, extending past the two houses from N. College Avenue to N. Morton St. Also, it is despicable that the address can not be changed by hand in the location field. The map tool is not precise.

closed #163550

Biking & Walking

1415 E 3rd ST

Case Date:
3/14/2018

I think it is now more than three years since there have been proper crosswalks for pedestrians crossing Third Street at the Jordan Avenue intersection. It is more than two years since the first time I wrote to inquire about it (March 2016). I was told then that it would be done in the summer of 2016. I wrote again in early 2017, and was told it would be done in the spring of 2017. A friend of mine wrote in the summer of 2017 and was told it would be done in the fall. What the heck is going on? After the recent work at Third and Woodscrest, new crosswalks appeared immediately. For it to take years at a corner where the pedestrian traffic is much higher seems truly unconscionable.

closed #163294

Potholes, Other Street Repair

1357 E 10th ST

Case Date:
2/24/2018

Big pothole on 10th street when you are driving west, on the right side of the road by the sidewalk.

closed #163258

Potholes, Other Street Repair

1000 E 17th ST

Case Date:
2/22/2018

On 17th street between Assembly Hall and Briscoe in the eastbound lane there are several large potholes that drivers have been reporting.