uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (10255)

closed #149176

Potholes, Other Street Repair

1211 W 6th ST

Case Date:
10/20/2015

The alley running west off Pine Street between Kirkwood and 6th has numerous potholes. it is paved where it comes off Pine and it is this section that is very rough and needs attention

closed #163292

City Performance

1211 W 2nd ST

Case Date:
2/24/2018

Traveling south towards this intersection, as if you're traveling on Adam towards 2nd/bloomfield, this light is failing to detect cars and switch. This is the 3rd time I've waited 6+ minutes and having to then get out of my car, hit the pedestrian traffic signal, just to get the light to sometimes change.

closed #155399

Blocked Sidewalk

1210-1298 South Henderson Street

Case Date:
9/3/2016

small tree/bush blocking sidewalk. Appears to be in front of no one's property.

closed #161794

Sidewalk & Curb Complaints

1210-1220 West Arlington Road

Case Date:
11/10/2017

large sidewalk gap on Arlington just north of the new roundabout, on the west side, it seems incomplete, or maybe they are going to finish it soon?

closed #164459

Street Lights

1210 W 8th ST

Case Date:
5/17/2018

Street light on south side of cul-de-sac is out.

closed #165100

Potholes, Other Street Repair

1210 S Lincoln ST

Case Date:
7/10/2018

Between houses 1210 and 1212 on South Lincoln Street, there is a section of pavement that has buckled and is allowing runoff to wash out the soil under the road and sidewalk. The size is approximately 16" X 36". It is located directly off of the curb, and near the driveway for 1212 South Lincoln St.

closed #139380

Potholes, Other Street Repair

1210 S Hearthstone CT

Case Date:
7/21/2014

pot holes need filled in front of 1210 Hearthstone Court

closed #139996

Potholes, Other Street Repair

1210 S Hearthstone CT

Case Date:
8/12/2014

closed #164968

Utilities Construction

1210 1/2 S Walnut ST

Case Date:
6/26/2018

Hello, There has been utilities construction going on by our apartment for over a month now. We understand that there is a lot of noise that comes along with it, especially since they have to break through multiple feet of rock to be able to place new sewer lines. We have been understanding in the last few weeks as rock hammering began at 7AM and went on through 5PM Monday-Friday. Even as this construction extended to Saturdays as well. As of last night however, the construction went on all night long. I am guessing that since this is a city run construction project that the noise ordinance was overlooked, however with the continued rock hammering this is unacceptable. It is disruptive and prevented us from sleeping through the night (which is especially impressive given that we have grown accustomed to the street noise typical of living on Walnut Street). Again, we get that this is an important project and that there is a lot of noise that comes along with that. However work through the night cannot continue. Sincerely, Brandon Fricke