closed #162308
Street Snow Removal
2553 S Smith RD
- Case Date:
- 1/15/2018
entire stretch of road from the 4-way stop at smith and moores pike down to about where the road name changes to winslow is never plowed or treated, very slippery today!
entire stretch of road from the 4-way stop at smith and moores pike down to about where the road name changes to winslow is never plowed or treated, very slippery today!
Path along IN46 is partially blocked with overgrowth. I can report to INDOT if this is not maintain by CoB.
Path along IN46 is partially blocked with overgrowth. I can report to INDOT if this is not maintain by CoB.
Location is approximate. May be a trails or INDOT issue. Foliage obstructing the sidewalk along IN 46E heading south toward College Mall. (East of Green Acres).
The stop sign is faded and barely visible
street full of grass, it stops up the sewer drains, when they mow and leave the grass in the curbs. thanks
excessive brush and weeds this house is a rental . and the tenants do not maintain the weeds and other junk constantly grow over the fence and into my driveway also a loud malfunctioning air conditioning uint runs 24/7
Observed today at 1030 hrs. Eastbound vehicle making a U turn after the Overhill traffic island to turn onto Overhill. Traffic was not heavy but this could have impacted 3 lanes of traffic. FYI.
My wife blew a tire this morning on a large pothole on Smith Road, between Moores Pike and E Rogers Road. I believe it is south of St. Remy Drive in the northbound lane of Smith Road.
The construction plan and closures are ridiculous. We get no notice of any road closures and we now have one way in and out of our apartment complex, which leads to a congested one lane road. We received no notice of any road closures which included our side of 45/46 and Pete Ellis. How am I supposed to get to work on time when you change the roads and lights during rush hour traffic which causes major traffic jams. The overall thought and planning put into all road construction in Bloomington is abysmal. If giving notice of road closures is too difficult to do then try to focus on completing the construction on one road before starting construction on another.