Utilities Construction
2210 E Ashwood CIR
- Case Date:
- 10/14/2021
I am the homeowner and have recently built an attached sunroom with sinks at this address. I need to connect the water pipe from those sinks to the city sewer line, and so would like to request a detailed sewer line map of/around my property, if available. Thanks.
- Case Date:
- 10/5/2022
Fienhydrant usage without back flow protection and meter. Spicewood addition. Contractor is Snedegar working with Duke Energy. 10/5/22 at 7 pm
- Case Date:
- 12/29/2022
I wish to file a request to the Utilities Dept. to survey the water main line servicing my home and the homes on E. Longview Ave. After two water main breaks in the past thirty days, I believe it would be prudent to survey the line for potential replacement or upgrade as necessary. I understand this survey may take time to allow staff to develop a plan. I hope that you might have equipment to survey to determine if there may be more weaknesses in the line or that a span of the line ought to be replaced. I would guess after two breaks, this request for survey might already be on your to do list at least for Spring 2023. Thank you -