closed #185009
Potholes, Other Street Repair
206 S Clark ST
- Case Date:
- 8/11/2023
"Road Construction Ahead" sign is still at 206/208 South Clark St. even though the work on East Third appears to be finished.
"Road Construction Ahead" sign is still at 206/208 South Clark St. even though the work on East Third appears to be finished.
Excessive debris and extreme overgrowth in the back yard causing infestation of insects and animals.
Grass is over a foot tall. We contacted the property management company over a week ago and they have done nothing.
The "walk" signals for crossing Third Street at High and Bryan Avenues never gave us the walk signal despite having pressed the pedestrian crossing buttons several times, and sitting through several cycles of the stoplight(s). This was both crossing Third Street heading north onto Bryan, as well as crossing Third Street south onto High.
The traffic light on E 3rd St and High St facing East (for people driving west on 3rd St) has the left turn arrow signal out
The left turn arrow light heading west on Third onto high street (turning to go south) seems to be out.
The left turn arrow for turning south on High Street does not seem to be functioning. I have waited there several times in the past few days without seeing arrow and eastbound traffic still has a red light.
Light is out, also the light at 4th & Hillsdale Dr is out
Street sign at S Hillsdale Dr and 4th Street is damaged
This 4th street corridor path has weed growing up through the path along the western end. It sure would be good if it was regularly maintained and kept free of vegetation.