closed #179744

Potholes, Other Street Repair

625 W 7th ST

Case Date:
5/5/2022

Large hole in street that takes up most of the westbound lane ever since water main repair on March 23. It was filled with rock but is getting worse each day.

closed #180199

Potholes, Other Street Repair

3424 S Cedarwood CIR

Case Date:
6/4/2022

In the 3400 block of S. Cedarwood Circle, the City dug up the road a few months ago, then never came back to finish the job. The road is a mess with missing asphalt and gravel/debris all around. Can the City get back out here this week to fix this and finish up the work they started? Thanks.

closed #180229

Sewer Problems (Storm Sewers)

1904 S Montclair AVE

Case Date:
6/7/2022

Road construction has Queens Way blocked. Construction was on the website earlier but has been removed. Construction is definitely NOT COMPLETED. Please update website with construction and new completion date.

closed #180232

Sewer Problems (Storm Sewers)

1400 - 1800 W 17th St, Bloomington, IN 47404, USA

Case Date:
6/7/2022

Sidewalks, drainage grates and side-paths are covered in leaves, twigs, tree debris, limbs, rocks. Some drainage grates are almost completely blocked with debris. This problem is from the roundabout West to the fly-over to Vernal Pike.

closed #180241

Debris Removal (Sand, General Street Debris)

Case Date:
6/8/2022

Two storm drain grates covered in debris. One along street at 114 E. 19th(recently reworked - buried with dirt and lots of debris AGAIN) and at 19th & N Wash covered in debris. These grates need to be on a hot list to check before and after heavy rains. Thank you. This has been a long time ongoing problem. Mitzy Lewis

closed #180255

Drainage or Runoff

1406 S Nancy ST

Case Date:
6/8/2022

The drainage between 1406 and 1404 S. Nancy is extremely backed up with debris

closed #180315

Sewer Problems (Storm Sewers)

3100 S Coppertree DR

Case Date:
6/14/2022

The street drain on the west side of the street is full of debris which inhibits drainage

closed #180393

Sewer Problems (Storm Sewers)

Case Date:
6/22/2022

A couple of months ago the city started installing new stormwater pipes on E Saratoga Dr. The project appears to have been abandoned mid-way through. One side of the street remains dug up and very loosely covered with gravel. Construction equipment has never been moved. Is there a timeline for finishing the project and restoring the road?

closed #180458

Sewer Problems (Storm Sewers)

2315 E Queens WAY

Case Date:
6/29/2022

This intersection drainage project has been weeks ongoing. Now we are left with an absolutely horrid street. The utility cuts were filled with gravel but have rutted out to be almost impassable. This is addition to the pot holes and drains that are unfinished.

closed #180829

Sewer Problems (Storm Sewers)

3100 S Coppertree DR

Case Date:
8/1/2022

Clogged storm water drain. Full of debris. Very slow drain. This is second request.