uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (309)

closed #186753

Other

1908 E Arden DR

Case Date:
1/11/2024

There is a construction sign that was left in our yard from some work that was being done in the neighborhood awhile ago. I think it had to do with laying fiber, but I'm not sure. Can this sign be picked up?

closed #173020

Traffic Suggestions

1908 S Rogers ST

Case Date:
7/13/2020

Intersection at Chambers Drive and South Rogers is often blocked for vehicles entering or exiting Chambers Drive. Please paint large X or similar pattern on pavement to keep this 3 way intersection clear.

closed #186746

Utilities Construction

1913 S Sussex DR

Case Date:
1/11/2024

This is in reference to an issue reported back in November - Case 186167. AEG was in our neighborhood in over three months ago, and left a haphazard trail of pipes sticking out of the ground, holes covered with thin sheets of plywood, and yards torn up and muddy. Can our neighborhood please have some sort of an update as to when they will be back to finish the job they started? Will yards be repaired and reseeded by this coming spring?

closed #178373

Street & Traffic Signs

1919 S High ST

Case Date:
12/8/2021

There has always been speed limit signs across from my house and my neighbor’s house (2 specifically are no longer there). They have been taken down since all the construction of our new 10 ft sidewalks. They need to be replaced! Many people are driving 40-50 miles an hour down our street now! With our new extra wide sidewalks, our street has heavy pedestrian traffic in addition to the school just down the street. It may also be partly because it looks like a very wide open road with the huge sidewalks, people feel they can go as fast as they want. A new flashing speed limit sign may be warranted now that the area has changed. Thank you! Please call me 317-362-8947

closed #185679

Blocked Sidewalk

1919 S Walnut ST

Case Date:
9/20/2023

Blocked stairs! I parked in the parking lot next to McDonald’s. Chop shop box advertising truck is blocking the stairs to access McDonald’s. I talked to manager of McDonald’s and she confirmed it was chop shop truck and that her employees try to park in that parking lot and can not access those stairs. I actually called them and asked why they was blocking those stairs and the lady had no answer. I said I was gonna make a complaint to city, the lady said do what I need to do!

closed #174187

Blocked Sidewalk

1935 E 2nd ST

Case Date:
11/20/2020

Why is this house allowed to have a paved parking area that blocks the sidewalk? They have a driveway is a two car garage on the west side of the house.

closed #178390

Blocked Street

1978 W Arbor Ridge WAY

Case Date:
12/11/2021

There is a large tree limb blocking about one half of Sudbury Drive between Weimer Road and W Arbor Ridge Way.

closed #173083

Blocked Sidewalk

2000 E Wexley RD

Case Date:
7/17/2020

Sidewalk here at the NE corner of High & Winslow is overgrown again, making access to the Jackson Creek Trail difficult for families with strollers, kids on bikes, etc. This has been an ongoing issue for several summers now. Can you please find a permanent resoution to keep this pathway clear and accessible?

closed #186909

Utilities Construction

2001 E Marilyn DR

Case Date:
1/26/2024

The fiber optic guys are here AGAIN! The are digging and drilling through our property. They asked if they could take down some of our fence to do their work. They admit they are back because they did not do a good job BEFORE. Our issue - we are concerned of that these contractors will damage our property sewer and/or water lines and we will be the ones stuck to deal with the aftermath of repairs and expense of repairs. Issue 2 - We have no idea on how to communicate with these guys!! What are our RiGHTS! Can you guys help us out? We feel helpless!

closed #177021

Sidewalk & Curb Complaints

2003 S High ST

Case Date:
8/16/2021

It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.