closed #172281

City Performance

320 W 8th ST

Case Date:
4/22/2020

I knew Longview and Pete Ellis were getting some apartments built in that lot, but apparently it is going to be more than usually allowed? I am SUPER concerned that you're going to be packing extra students (almost all will have cars) on a road that is NOT designed for heavy traffic but SUPPOSEDLY a bike path for bikes. It might be great, but what are the extra precautions taking place to ensure students zipping in and out won't disrupt the greenway and kill cyclists? Hoping some will be cyclists, but realistically there is going to be a lot of in and out speedy traffic there for what was a very calm road fantastic for biking. Want to make sure it's not overlooked. Also, anything big built east of College is going to experience major backup on rush hour times at College and 3rd. I know it's a state intersection but the city needs to look into it and factor in the ability of that intersection to take on more traffic. Something needs to change there. It literally clogs (outside of a pandemic) constantly with left turn traffic from 3rd turning south to College, which block eastbound 3rd street. Time and again. Part of the problem is it clogs at the next light (the city's I would imagine) by Fazoli's as the lights aren't coordinated well if at all. So two concerns: not a bad place to live, including for students - way better than century village hotel, but make sure the bike path remains safe! This can't be presumed. That area will change big time and cyclists need reassurance. And 2) light at 3rd and College is going to be negatively impacted and timing or something needs to be looked at there. The east/west greenway I was hoping was going to be getting ENHANCEMENTS in the next year or two, not becoming a motorist highway :( Thank you.

closed #173300

City Performance

121 S Smith RD

Case Date:
8/8/2020

Submitted a report but didn't show up in the system? Someone is going to die, likely multiple, if changes aren't made to Smith and 3rd. New 3rd by the State is great but has caused something to change with the Smith traffic. Left turners are hesitating backing up traffic (no big deal) but they are hesitating because cars behind them are zipping around going straight while folks are trying to wait and turn. Meaning the folks can't turn safely, and when they do POW crashes like tonight at 7 pm happen. Please do a traffic study and coordinate with the State for immediate safety improvement. Please do not punt this to the State, but be involved, as Bloomingtonions are going to die; forget traffic, this is about safety. Ideally there needs to be a left turn green arrow only and then a straight signal but that may need lanes. So I don't know the solution, but cars zipping around hitting left turners, etc. is NOT sustainble.

closed #174036

City Performance

W 17th St, Bloomington, IN 47404, USA

Case Date:
11/1/2020

Why has the construction project on West 17th not been completed? Don't tell me it is behind schedule. I want specifics.

closed #179574

City Construction Projects

Case Date:
4/20/2022

The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.

closed #180319

City Construction Projects

Case Date:
6/14/2022

Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?

closed #181067

City Construction Projects

S Rogers St & W That Rd, Perry Township, IN 47403, USA

Case Date:
8/16/2022

New traffic patterns require 4way stop or light. Please do not wait for the subdivision to be completed. Install now please.

closed #181310

City Construction Projects

500 W Fairway LN

Case Date:
9/1/2022

New construction site on South Rogers is scattering debris on the road. I live in Clear Creek housing edition and have to travel on South Rogers every day for work. In the past 2 weeks I have had two separate issues with the same brand of screws in my back left tire. I travel on I69 for work and have been traveling at 60 miles an hour with a screw in my tire. This has happened twice in two weeks at no fault of my own. This set of tires is less than 6 months old and today I found out from Royal Mazda that I need to purchase a new tire. This is unacceptable from a point of safety for the South Rogers neighborhood and an additional cost to citizen(s) of Bloomington.

closed #181401

City Construction Projects

Case Date:
9/7/2022

Badly needed stop light at Tapp Rd. & Leonard Springs. Also, a tree blocks visibility at this location.

closed #181800

City Construction Projects

7th & Washington, Bloomington, IN 47408, USA

Case Date:
10/12/2022

Hi there! It seems like every week there is an accident at the intersection of N Washington and 7th street. I’m wondering if you could put a stop sign there since it’s really dangerous for people driving and pedestrians crossing. Thanks!

closed #182178

City Construction Projects

709 N Keystone CT

Case Date:
11/30/2022

please add a traffic signal here this can be a dangerous intersection. a traffic signal here will aid the city bus (route 6 and 6L) in making its runs and traffic flow for cars, bikes and pedestrian's.