uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (15080)

open #182248

Utilities Construction

1205 S Collinswood DR

Case Date:
12/10/2022

My water is off. There has been work in the area, but no communication about it. No work occurring today. I am quite disturbed that it appears I might be without water for a while with no information about it.

closed #182260

Utilities Construction

Case Date:
12/13/2022

We will not use garbage collection service for several months, but City will still charge us for the service unprovided, only because your billing system was set up that way. Is this legal to charge residents for the service you are not providing ? Sounds ridiculous and illegal. Hope Mr. Mayor could see to it and step in for a immediate correction. Thank you.

open #182511

Utilities Construction

1020 S Woodlawn Ave, Bloomington, IN 47401, USA

Case Date:
1/17/2023

From Reddit Bloomington: Fiber cables damaging sewer lines We live right next to Bryan Park. About a week ago our toilet backed up, and after multiple visits from our (very honest and reasonable) plumber, we discovered that the city's fiber optic internet contractor had carelessly run an optic cable directly through our sewer line. This caused a ton of debris to get into our drain pipe and completely clog the pipe, necessitating a $10k repair. I called the city and apparently, this is happening to people all over town. (The person in the utilities office said I was the third person to call today with this exact problem, and our plumber said that this contractor got thrown out of Carmel for damaging so many sewer lines).

closed #183614

Utilities Construction

1709 E Circle DR

Case Date:
4/27/2023

Water near hydrant all the time. Either slow leak or natural spring?

closed #185376

Utilities Construction

Case Date:
9/1/2023

The company, installing fiber optic cables on my St., South, Lori Lane, destroyed my drainage that goes underneath my driveway. We are in a flood zone, and if this isn’t corrected my driveway, which is gravel, will wash away. I’m really shocked how careless the company was in excavating my property without fixing it. My house is at 80 S. Lori Ln.

open #185582

Utilities Construction

S Mill Stone Way, Bloomington, IN 47401, USA

Case Date:
9/14/2023

Gigabit or AES or their contractors are installing fiber optic cable or something such as that. Will they be repairing all the grass from the holes and tracks from the heavy equipment?

closed #185662

Utilities Construction

Case Date:
9/19/2023

Cbu replaced 3 hydrants during main replacement. These areas need to be replanted . Additionally during one replacement irrigation damage resulted in a $400 charge for repair. We request reimbursement

open #185872

Utilities Construction

S Mill Stone Way, Bloomington, IN 47401, USA

Case Date:
10/4/2023

Gigabit or Giga-something installed fiber optics in the neighborhood. The holes they dug in the grass were not repaired. After advising them of the situation they came out to "repair" the grass. The soil was filled with rocks and gravel. There were no grass seeds in the soil. I spent a whole day picking rocks and gravel out of the soil, buying top soil, and grassseed to fix this. The ground is no longer level and there's also rather gouges or chunks in sidewalks and curbs. The road had preexisting, but plugged pot holes near the Sare entrance, but now those potholes are open again and expanding.

closed #185949

Utilities Construction

3100 S Coppertree DR

Case Date:
10/12/2023

Grass killed by large piece of equipment left on the turf which should have been left on the street. This occurred during water main replacement over late summer. Requesting repair

closed #172192

Utilities Construction

600 E Moody DR

Case Date:
4/9/2020

Three very large pipes have been lying in my yard for over one week now. I believe that this is for a contracted public works project. I do not want to approach the workers during this public health crisis as they are not wearing face masks. I would like to be able to mow my lawn this weekend, and I do not feel that the lawn of an occupied house is the appropriate place to store construction equipment. I would like to request that the workers are instructed to remove the pipes from my lawn either today (Thursday, April 09, 2020) or tomorrow. In the event that this is not a water-related project, I would assume the city has permits on file to communicate with the appropriate party.