Potholes, Other Street Repair
- Case Date:
- 3/23/2024
On the corner of Covenanter and high on the right as you’re heading south on high there’s a dangerous drop off into a rocky drainage area that needs to have a guardrail or some type of protection. The road lists in the direction of the drop off and at some point fire and rescue is going to have to fish a car out of the drop off. Not sure how this was allowed to be built without a guardrail. It may be the biggest pothole in the city.
Potholes, Other Street Repair
- Case Date:
- 3/24/2024
Close to 610 S Pleasant Ridge on the right hand side of the incline is a filled hole that is sagging pretty badly.
Potholes, Other Street Repair
207 S Rogers ST
- Case Date:
- 3/26/2024
I don't have a current photo but particularly since the utility work completed on this stretch of road the parking spots in front of the shops flood and hold water. The gradient actually seems to slope away from the drain instead of towards. As a result, we frequently have to bail out the parking spots to make them usable for customers. Flooding issues include the accessible parking spot, which poses a risk to the mobility impaired. How can we best collaborate on a solution? Thanks!
Potholes, Other Street Repair
346 W 17th St, Bloomington, IN 47404, USA
- Case Date:
- 4/2/2024
Unevenness in paving acts as a *huge* pothole needs to be fixed asap. On west side of Kinser/rogers right by NAPA store. Cars hit it right before crossing the intersection of Rogers/17th going South on the right side tires
Potholes, Other Street Repair
500 S Muller PKWY
- Case Date:
- 4/11/2024
The potholes going into The Village are INSANE. I have called and called the office and have yet to get a clear answer as to when these multiple potholes would be filled. One of my friends works in the office and said they are aware- and are also aware they are 4 inches deep. The road going into the complex is very narrow and now filled with potholes- making it impossible to avoid them. These will cause very serious damage to my car.
Potholes, Other Street Repair
- Case Date:
- 4/17/2024
Flooding down Brownridge is starting an erosion hole again the road side with a drop of about 3 ft. from the road bed. A short load of stone (2-3 yds maybe) added to the previous should solve it; the last treatment has remained stable and has worked well.
Potholes, Other Street Repair
- Case Date:
- 4/25/2024
The utility manhole covers in the Northbouand lane of Walnut Street from Miller Drive to Grimes are below the pavement level and need to be raised to pavement lever. This condition has existed since Walnut Street was re-paved years ago. Please fix. Thank you
Potholes, Other Street Repair
MONROE COUNTY HEALTH SERVICES BUILDING, 119 W 7th St, Bloomington, IN 47404, USA
- Case Date:
- 4/26/2024
Alley on the north side of 112 W 6th Street, Bloomington IN: there is a guardrail installed, the base is utterly deteriorated, very loose to the touch, poses a danger to pedestrians and any vehicular traffic brave enough to use the ease and/or north alley. Needs to be repaired. Thank you.
Potholes, Other Street Repair
- Case Date:
- 5/8/2024
The street sign at S Churchill Court has faded out completely. It needs to be replaced. Visitors have difficulty finding out home on this court.
Potholes, Other Street Repair
- Case Date:
- 5/12/2024
Could the utility cut at the intersection of Nancy Street and Mark Street on the east side be paved, please?
Thank you.