uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (25)

open #187902

Sidewalk Requests

2009 S Ramsey DR

Case Date:
4/5/2024

Tripping hazard caused by uneven sidewalk section.

open #187890

Utility Construction Projects

Case Date:
4/4/2024

There is a large pipe knocked down from the corner of South Rogers Street and Hillside, it is laying on the sidewalk.

open #187648

Potholes, Other Street Repair

2515 E Caray CT

Case Date:
3/17/2024

Two large potholes in neighborhood. First is near intersection of Caray Ct and Claybridge Dr. Second is in Southern Oaks Dr (between Cedarwood Circle and Sare Rd). Also, there is no street sign on the intersection of Canada Dr and Claybridge Dr. Can the neighborhood get a street sign here? Thank you Ryan Niehaus

open #187608

Sidewalk & Curb Complaints

2661 E 7th ST

Case Date:
3/13/2024

Can the sidewalk at xxx East 7th Street be shaved down to eliminate the height difference between the two adjoining slabs? See photo attached. This height difference can be dangerous for westbound cyclists riding on the sidewalk who need to negotiate both a quick right turn and a left turn to enter the SR46 underpass. Now that an asphalt multi-use path has been built at Relato Bloomington at the intersection of Pete Ellis Drive and Longview Avenue, westbound cyclists are more apt to ride on the path/sidewalk vs. the street, and will continue to ride on the sidewalk all the way to the underpass. Cyclists will be going at speed since it is downhill westbound. To negotiate this sidewalk height disparity, while at the same time negotiating a sweeping turn, poses a dangerous situation that can be easily eliminated.

open #187388

Biking & Walking

Case Date:
2/21/2024

northbound bike lane on rogers between 8th st and b line (part of the detour). i found a CBU detour sign partially blocking this bike lane and i carried it down to their construction site at the b line. then i encountered this storm drain, which is at least 3 inches below grade, from poor milling practices when the road was resurfaced last year. these partial obstructions make the bike lane more technically demanding than it should be. not a fair substitute for the all-ages all-abilities b line.