closed #184526

Sewer Problems (Storm Sewers)

Case Date:
7/9/2023

All of the storm sewers along Hillside De that I ran past this morning between Moores Pike and Henderson were very clogged with debris and mud. You could barely see where they were besides the excess sticks, leaves, and mud buildup. Often times our neighborhood drains (Sycamore Knolls) are similar after a big storm.

closed #184210

Drainage or Runoff

Case Date:
6/15/2023

Not sure if this is correct department. My request concerns work done to reposition storm drains on the above-cited street. Thanks for improving all four drains. But several residents have noticed and are concerned about a deep hole in the green space located just a few feet directly East from the physical drain. I believe digging was done there as part of the drain improvement project. The deep hole must be filled in and seeded as it is a hazard to small dogs and to people. Please advise. I hope this hazard can be remedied.

closed #184065

Sewer Problems (Storm Sewers)

Case Date:
6/1/2023

Clogged sewer drain. Second Request

open #184738

Potholes, Other Street Repair

Case Date:
7/23/2023

The ditch between my driveway and the adjoining driveway is clogged with dirt and debris that I want removed. I can do it, but I don't want to encroach on a neighbor's land or the City of Bloomington land without permission. the ditch is not on the pavement but may lie within the City's right-of-way, and I may need your permission or guidance to clear the drainage ditch and empty the culvert underneath my driveway. Is University Street an easement or a fee title? We also have a dead ash tree a yard from the pavement on the lot line, probably due to the Asian emerald ash borer, an invasive pest, and I have other live ash trees that I would protect. What are the rules for removing the hazard tree?

closed #185004

Drainage or Runoff

Case Date:
8/11/2023

The issue occured in Winslow Woods Creek during native habitat restoration in the creek running north to south between Aug 3, 2023 and Aug 4, 2023. The Urban Greenspace volunteer Weed Wrangle team were working in a dry creek on Thursday Aug 3 pulling Japanese stiltgrass between 8am to 10am. On our return Friday morning Aug 4, 8am to 10am, we found the creek saturated, pools of water in some areas, our pulled weeds banked in small dams, all indicating a flood had occurred during the 24 hour period. It did not rain during this period. I called CBU 812 339 1444, on Aug 4, at 1:44pm, to ask if a water main had been discharged during the time in question. No one has returned my call. Thank you, I look forward to hearing a response.

open #185392

Debris Removal

Case Date:
9/2/2023

Once again the storm sewer drains in front of my house and across the street are clogged with debris. I do my share of keeping the drains free, but I think it is also incumbent upon the City of do its share. Keep in mind that it is now yet the season when falling leaves block drains and before the area between the street and sidewalk are dug up again to have more broadband fiber laid.

closed #185389

Potholes, Other Street Repair

Case Date:
9/2/2023

This will cave in soon and make a bigger hole.

closed #179219

Potholes, Other Street Repair

Case Date:
3/10/2022

At the intersection of East Arden Dr, and Sycamore Ct., a cover used to prevent construction debris from entering the storm sewer inlet has yet to be picked up. It may pose a traffic or pedestrian hazard. Thank you.

closed #176261

Sewer Problems (Storm Sewers)

Case Date:
6/19/2021

I checked and cleared storm drains on Sussex and Queensway yesterday afternoon and removed debris, except those two near High St that have filters to prevent construction from the new "trail". This morning with the help of a neighbor cleared the Sussex drains. I then cleared those on Queensway. The problems of separation of the present layer of pavement on Queensway and knowing there was a potential of heavy rain from the present on later storms today. I piled a significant amount of loose pavement with the debris at the south drains at the intersection of Queens Way and Chelsia Court. incase of heavy rain today. Also all three of these drains have a significant amount of eroded pavement below the drain's grates. Thus these debris may in the future become plugg the storm drain.that goes down just past Sussex Dr and result in potential stormwater flash flooding as in June of 2007 that damaged my neighbors property.

closed #175611

Debris Removal

Case Date:
4/27/2021

I have adopted the storm sewer drains on Sussex and Queensway between High and Montclair. I just finished checking them because of the forecast for heavy rain on 4-28 and 29. I piled pavement debris that has accumulated on Queensway on its south east and west intersection with Chelsey Court to prevent obstruction of these two drains.