uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (490)

closed #179191

Yard Waste

809 S Gatewood DR

Case Date:
3/7/2022

Large brush pile blocking sidewalk since last summer

closed #176411

Website & Web Services Feedback

521 W Kirkwood AVE

Case Date:
6/30/2021

There are tall orange cones in front of 521 W. Kirkwood & pink paint marking the lawn & sidewalk. Same set-up across the street. If the city is planning to dig up something--pipes, et, will this affect where the BL Transit can pickup & drop passengers? I catch the bus in front of 521 to go to work. Thanks.

closed #172334

Website & Web Services Feedback

800-848 E Winslow Rd, Bloomington, Indiana, 47401

Case Date:
5/1/2020

Hello, I am wondering if there are plans to finish the bikepath from Henderson along Winslow all the way up to Highland and the Winslow Sports complex. I live in Sherwood Oaks, and this would make biking to work on campus and biking downtown much safer for me. It would be great if someone from the city could reach out to Sherwood Oaks Neighborhood and let us know up sidewalk and bikepath plans along winslow, henderson and rhorer. I would also like to see a sidewalk all the way from Henderson to Jackson Creek Middle along Rhorer.

closed #173221

Website & Web Services Feedback

Bloomington City Hall

Case Date:
7/31/2020

Hello, I live on Euclid Ave and have to make frequent turns onto W 2nd St. On the corner of these streets, across from the church there are overgrown plants/weeds beyond the sidewalk. It's impossible to see any cars coming from the left while on Euclid Ave. The hill makes it difficult but the plants take any vision left. I've accidentally almost involved myself in accidents due to this. I and I'm sure others would appreciate the obstruction be removed if at all possible.

closed #187861

Utility Construction Projects

3890 S Claybridge DR

Case Date:
4/2/2024

Two sinkholes have formed, one at the corner of Claybridge Dr and Sare Rd, the other about 30 ft up the sidewalk on Claybridge, after recent neighborhood groundwork that had been done by the contractor for Bloomington Gigabit Now Fiber project. The sinkholes are a hazard to pedestrians and are in need of repair as soon as possible.

closed #186541

Utilities Construction

719 W 7th ST

Case Date:
12/15/2023

They had a water line or sewer line emergency at 719 W 7th and contractors tore up a lot of sidewalk on the South Side of W 7th Street in front of the house. Who is responsible for repair or sidewalk? This happened Thursday night and continued all day Friday 12/15. Contractor was Snedegar Construction.

closed #154678

Trash

502 S Jordan AVE

Case Date:
8/9/2016

Trash left on sidewalk

closed #155503

Trash

509 1/2 S Highland AVE

Case Date:
9/6/2016

Trash left sitting out on curb at all times in the 500 block of S Highland Ave (between Hunter Ave and 2nd St on the east side of the street). Trash becomes scattered on the sidewalk. Attracting unwanted wildlife (raccoons, possums, skunks) in the area and is unpleasant to neighbors.

closed #136875

Trash

301–399 N Washington St

Case Date:
3/25/2014

Sheet of broken glass on sidewalk outside AT&T building 305 n Washington

closed #149468

Trash

Case Date:
11/5/2015

1624 E 3rd. Open trash in bags and in yard and sidewalk.