Trails
1973 E Winslow Rd, Bloomington, IN 47401, USA
- Case Date:
- 3/7/2021
The two large limestone stones at the entrance to the Jackson Creek trail are being damaged. It started with the rock breaking off, but this morning the pieces had been used to scrawl names and words on the stones.
Trails
1975 S High St, Bloomington, IN 47401, USA
- Case Date:
- 9/26/2023
Can we do *anything* to address all the speeding on High Street? It's out of control! Some of those speeders are coming from Renwick. We have proven this. We are NOT A RACETRACK. We have children using that new path.
Potholes, Other Street Repair
1977 N College Ave
- Case Date:
- 9/2/2025
A large pothole located at the intersection of N. College Avenue and W. Riley Drive in Bloomington, Indiana. The pothole is situated directly at the entrance to the Steak ’n Shake and Granite Apartments.
This pothole is significant in size and depth, creating a potential hazard for drivers entering or exiting the area. It poses a high risk of causing damage to vehicles, including tire blowouts, wheel damage, or suspension issues. Additionally, its location at a busy entrance increases the chances of accidents or traffic disruption.
I recommend that the pothole be inspected and repaired as soon as possible to prevent damage to vehicles and to maintain road safety in this high-traffic area.
Potholes, Other Street Repair
1977 West Tapp Road
- Case Date:
- 5/16/2013
Now it is possible to walk to the head of the Clear Creek Trail safely crossing Tapp Rd using the Adams St roundabout. There is a curb cut on this roundabout that needs repair. The rectangular region is missing its bricks. Instead there are boards with nails sticking up.
Potholes, Other Street Repair
1977 West Tapp Road
- Case Date:
- 5/16/2013
Now it is possible to walk to the head of the Clear Creek Trail safely crossing Tapp Rd using the Adams St roundabout. There is a curb cut on this roundabout that needs repair. The rectangular region is missing its bricks. Instead there are boards with nails sticking up.
Potholes, Other Street Repair
1977 West Tapp Road
- Case Date:
- 5/16/2013
Third Try on Image.
Now it is possible to walk to the head of the Clear Creek Trail safely crossing Tapp Rd using the Adams St roundabout. There is a curb cut on this roundabout that needs repair. The rectangular region is missing its bricks. Instead there are boards with nails sticking up.
Blocked Street
1978 W Arbor Ridge WAY
- Case Date:
- 12/11/2021
There is a large tree limb blocking about one half of Sudbury Drive between Weimer Road and W Arbor Ridge Way.
Other
198 South Elm Street
- Case Date:
- 8/14/2015
Rose Hill Cemetery is disrespectfull! The weeds are covering headstones, you can't see half of them due to weeds. Something has to be done and soon. This is just awful, I was really upset when I went to see my family, and couldn't due to weeds coving there graves.
Website & Web Services Feedback
1981 S Henderson St, Bloomington, IN 47401, USA
- Case Date:
- 9/7/2020
The new median installed seems like an addition to try to help pedestrians make a safe transition across the street. I think that’s a great step as I often have worried about students at dismissal from south trying to safely make their way across that intersection to the bus stop. However as it currently is, it is not safe for drivers & maybe not even pedestrians. I watched 2 cars drive right over it just after dark, one definitely popped a tire. When I passed it another time I noticed multiple tire marks over the median. There does not seem to be clear enough markings on the median to warn drivers that they need to swerve to the side to avoid it. This is certainly true at night, yet I believe may be true during the daytime too as there are no signs or markings to show that the driver must shift to the right around the median or slow down in any way. Perhaps this measure taken to try to improve safety is actually more dangerous to all. A pedestrian may have a false sense of safety standing on an unmarked median that is not early visible or marked for cars to see. Can it be made into an official crosswalk with proper signage and clear expectations for drivers to slow, be aware and stop for pedestrians? Please take steps to make this safer for drivers and pedestrians. If school ever resumes this seems even more dangerous than it was before the addition of this median. Thank you!
Potholes, Other Street Repair
1982 E Cheyanne LN
- Case Date:
- 2/7/2025
Two large potholes