closed #161451
Potholes, Other Street Repair
821-913 North Blair Avenue
- Case Date:
- 10/5/2017
Storm drainage system on N Blair needs concrete repaired before winter. Ends if metal grating are exposed and may catch on snow plows
Storm drainage system on N Blair needs concrete repaired before winter. Ends if metal grating are exposed and may catch on snow plows
Major construction debris is littering Dunn by the large construction crews entering and exiting the site across from the Football stadium. Completely hazardous to any 2 wheel vehicle, let alone potentially damaging to cars by flipping up rocks
Southeast corner of 2nd & Jordan
Lots of mud on 17th and Dunn due to construction for apartments across from Memorial Stadium. Also, the City of Bloomington app to report issues is no longer working with iOS11.
large, deep, dangerous pothole
15'wide by 31/2' deep right in front of mail box. Filled last winter but chipped out soon after.https://photos.app.goo.gl/FoU3irUNgvMUGF4I3
at the intersection of Elliston and Fenway road is coming apart with multiple potholes developing
Utility cuts across roadway need patched & leveled
Pavement markings for turn lanes need replaced
Crosswalk & stop bar pavement markings need replaced on most S Rogers St intersections south of W 2nd St