- Case Date:
- 10/4/2022
I often see trash in or near the bus stop at the Mall (close to one of the former Macy's entrances): plastic coat hangers, beverage containers, empty plastic bags, etc. Can you place a trash can there, like you so magnificently did at the bus stop in front of The Brew House? Thanks!
- Case Date:
- 10/5/2022
Fienhydrant usage without back flow protection and meter. Spicewood addition. Contractor is Snedegar working with Duke Energy. 10/5/22 at 7 pm
Sewer Problems (Sanitary Sewers)
- Case Date:
- 10/12/2022
Deep sink hold forming near lift station
- Case Date:
- 10/24/2022
A red Hyundai Accent has been parked in the same spot since July 2022 and is becoming a nuisance for trash pick up. With winter coming this car is in the way for snow removal.
Sewer Problems (Sanitary Sewers)
- Case Date:
- 11/27/2022
Sewage backup after underground utilities work in my yard. Possibly a broken sewer line from the right of way to the sewer main. I first reported this the day of the water main break next door(205 S Hillsdale Rd) to the city workers outside my house. This is now critical. I have called several times. The last time was Friday, Nov. 25th, 2022.
Bus Services (Bloomington Transit)
- Case Date:
- 11/30/2022
https://www.google.com/search?q=bloomington+transit&source=lnms&tbm=isch&sa=X&ved=2ahUKEwix0cT509b7AhUTIjQIHSXwA-8Q_AUoA3oECAEQBQ
Bus Services (Bloomington Transit)
- Case Date:
- 12/8/2022
Bloomington Transit Late Night bus service FAIL: At 10 pm on Dec 7, t did not work on either the Uber or Lyft app. Uber link from the BT website said “NO VOUCHERS LEFT.” Lyft app did not accept the BTLATENITE voucher code. When I called the BT dispatcher, he did not offer to help but rather have me a number to call Uber.
- Case Date:
- 12/28/2022
Possible water line break at East Sheridan and South Hawthorne.
- Case Date:
- 12/29/2022
I wish to file a request to the Utilities Dept. to survey the water main line servicing my home and the homes on E. Longview Ave. After two water main breaks in the past thirty days, I believe it would be prudent to survey the line for potential replacement or upgrade as necessary. I understand this survey may take time to allow staff to develop a plan. I hope that you might have equipment to survey to determine if there may be more weaknesses in the line or that a span of the line ought to be replaced. I would guess after two breaks, this request for survey might already be on your to do list at least for Spring 2023. Thank you -
- Case Date:
- 12/31/2022
Water main break? 602 S Ravencrest, 47401