Sewer Problems (Storm Sewers)
510 E Lakewood DR
- Case Date:
- 4/28/2022
In November the city engineering team came out and added a new side inlet to an existing drain that goes under Dunn street from the back of 2950 N Lakewood. However, the only erosion prevention put in place was some straw. With all the nearby honeysuckle/plant removal the recent storms have caused a lot of the nearby dirt (and straw) to move and now the drain is almost completely filled with dirt and debris that has entered in the last couple rain storms. I tried reaching out a few times (Kriste L and Phil P) this past winter but haven't seen anything put in to help hold the dirt in place until some plants/grasses grow in. The water flow is certainly much improved with the new inlet, but in my opinion the job is just not quite complete.
- Case Date:
- 4/28/2022
Graffiti by big white ball on Kirkwood and Walnut
- Case Date:
- 4/28/2022
Graffiti on ground in front of bookstore on Walnut
- Case Date:
- 4/28/2022
More bricks missing on N side entrance to Carmichael Center Building: part 2
- Case Date:
- 4/28/2022
Bricks missing infront of N side entrance to Carmichael Center Building.
- Case Date:
- 4/28/2022
Most audible signals around the square in downtown Bloomington are set too low to hear. As an orientation & mobility instructor it is difficult to train a future IU student how to train for cane and dog use.
Street & Traffic Signs
1071 E Knollwood CIR
- Case Date:
- 4/28/2022
Missing Speed Hump sign
Potholes, Other Street Repair
College Square Apartments Building B, Bloomington, IN 47401, USA
- Case Date:
- 4/28/2022
Lots of potholes along Walnut Street Pike
Potholes, Other Street Repair
750 E Moss Creek DR
- Case Date:
- 4/28/2022
Pothole
Traffic Signals
1420 S Walnut St, Bloomington, IN 47401, USA
- Case Date:
- 4/28/2022
Traffic light has been malfunctioning for going on two years. When will it be repaired?