uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (1189)

closed #167056

Potholes, Other Street Repair

German American

Case Date:
1/13/2019

Large pothole on E 4th between Union and Bryan.

closed #167308

Potholes, Other Street Repair

German American

Case Date:
2/5/2019

Pothole at the intersection of E Second and College Mall Rd near the gas station. Also, one at 2520 E Second

closed #168581

Street & Traffic Signs

Grazie Italian Eatery

Case Date:
5/17/2019

Missing signal button for crosswalk

closed #169289

Blocked Sidewalk

Hickory Heights Tlpk, Bloomington, Indiana, 47403

Case Date:
7/4/2019

I tersectio. W 37/69 west of auto repair place on Deborah drive, blocking way across on ramp

closed #168789

Traffic Related Complaints

IN-46 E, Bloomington, Indiana, 47404

Case Date:
6/4/2019

To whom it may concern, I am a concerned citizen and tax payer that would like to bring up an issue and question pertaining to the road construction in Bloomington, IN. In particular, my query pertains to the construction drums/barrels that are located on State road 46/45 between North Walnut street and Ellettsville, IN. I would like to know why there has been construction drums/barrels spanning this location for 3-4 weeks now, at least, with no construction working at this location. I drive home every day around 2-3pm and have not once seen construction crew at this location working since the drums went up. There have been crew work on a light down by Kinser/46/45 the last couple of days, but if this is the case i don't see why construction barrels are running to Elletsville. These construction barrels are blocking off a whole lane of traffic causing uneeded delays in travel using one if not the busiest road in Bloomington. I understand there may be scheduling conflicts with getting road crew etc out but to block miles of road with no one working on the road for weeks/months is uncalled for and does nothing but hurt the people that travel the road which consequently are the same people that paid for it. I don't think its unreasonable for an explanation. I don't understand why you would inconvenience people and shut down half the road for miles when quiet literally no one is working on the road. It seems a better solution would be to keep the road free until you are ready to start working on it, then place the drums. I look forward to hearing back on this issue and please let me know if you have any questions. Thanks, Dustin Headley

closed #170941

Street Lights

IN-46 E, Bloomington, Indiana, 47408

Case Date:
11/11/2019

At intersection of IN46 and 10th street, when there is a train, east bound traffic doesn't get a green light, while westbound traffic gets multiple green lights.

closed #167371

Biking & Walking

IN-46 W, Bloomington, Indiana, 47408

Case Date:
2/8/2019

Bike tunnel at 7th & Bypass needs post-flood cleaning. Drains are mostly blocked.

closed #166396

Traffic Related Complaints

IN-48 W, Bloomington, Indiana, 47404

Case Date:
11/1/2018

When will this double turn lane onto 37 be open. It backs up the left lane back past Hardeeā€™s during high volume traffic. The turn lane should be timed longer on the 3rd and 37 exit so traffic can flow better

closed #168109

Street Lights

IN-48 W, Bloomington, Indiana, 47404

Case Date:
4/15/2019

3rd and Franklin is back on a timer and not a smart light. Heavy backups at rush hour.

closed #167135

Potholes, Other Street Repair

Indiana University, Bloomington, Indiana

Case Date:
1/21/2019

Pothole at the east side of the speed bump between Rose and Eastside Drive.