City Construction Projects
401 N Morton ST
- Case Date:
- 8/9/1996
Sidewalk on Maple from 5th to 6th was recently replaced. While it needed to be replaced, this was a historic sidewalk as are many on the west side. Policy should be developed to preserve historic sidewalks in original condition when repairing/replacing.
- Case Date:
- 2/25/1998
THE SIDEWALK IN FRONT OF 2007 E 2ND STREET IS FLUSH WITH THE ROADWAY. THE SIDEWALK IS NOT RAISED IN THIS AREA. IT IS VERY DANGEROUS.
- Case Date:
- 6/5/1998
Moores Pike & Sare Road: SE corner and sidewalk south to culvert are over grown with weeds and grass; sidewalk needs to be cleared of sand/debris.
Excessive Growth
S SARE RD
- Case Date:
- 8/7/1998
SIDEWALK ALONG SARE ROAD FROM HILLSIDE IS OVER GROWN AND COVERED WITH SAND
Excessive Growth
422 S Henderson ST
- Case Date:
- 8/24/2001
Obstruction due to vegetation growing onto the sidewalk.