closed #184805
Blocked Sidewalk
404 S Fess AVE
- Case Date:
- 7/28/2023
Republic cart and dumpster entirely blocking sidewalk
Republic cart and dumpster entirely blocking sidewalk
If you try to pull out of that shopping center and you look south to try to pull out on Walnut there is a big sign truck that blocks being able to see the cars coming. I e almost been hit because you have to pull so far for to see oncoming traffic before you can pull out. I believe it belongs to BBs market, weve asked them to move it , but that was 2 weeks ago
Please remove the two piles of extra concrete that were left on either side of the new water garden the city installed in front of my house at 510 W Allen St. These are eyesores and are left over from the construction.
The company installing fiber optic broadband destroyed part of the road in our cul-de-sac, busted a water pipe, and left the road in pretty bad shape. This is a flooding hazard and has damaged the aesthetics of the neighborhood as well.
Attn Barry Collins, hello, this is Robyn Griffith and I want to report Jessica Morrow, Doug Klyn, Morgan Gilreath and James Tussey for manufacturing meth on my property without my knowledge and pouring it down my toilet, breaking my new outside gas line, feeding me chili with worm vot and feces and theft of my US Air pay card and funds and Ernie Wright having my water turned off refusing reconnect all by criminal gang techniques. I need help please and thank you.
Weeds growing across the sidewalk path
Not exactly a blocked sidewalk, but this railing is pretty Stabby, especially for intoxicated individuals
Trees and bushes overhanging street so view exiting Glendora onto Walnut St is blocked. I think the house is empty and the owner moved out.
Nate and Brad emergency Jeremy Dalton is electrocuting us to death and has Garrett in a tunnel threatening him
Please remove the confusing road closed and road closed ahead signage on Rogers street off of kinser pike, as the road is routinely open and causing traffic issues. All of this was supposed to be done prior to school beginning. When will the 17th street stuff with duke be finally completed? This town is causing construction fatigue as of late. Very worries about even more future re-routing and closures over long periods of time.