City Construction Projects
500-520 S Walnut St
- Case Date:
- 4/18/2012
Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.
City Construction Projects
500 W Fairway LN
- Case Date:
- 9/1/2022
New construction site on South Rogers is scattering debris on the road. I live in Clear Creek housing edition and have to travel on South Rogers every day for work. In the past 2 weeks I have had two separate issues with the same brand of screws in my back left tire. I travel on I69 for work and have been traveling at 60 miles an hour with a screw in my tire. This has happened twice in two weeks at no fault of my own. This set of tires is less than 6 months old and today I found out from Royal Mazda that I need to purchase a new tire. This is unacceptable from a point of safety for the South Rogers neighborhood and an additional cost to citizen(s) of Bloomington.
City Construction Projects
500 W 7th ST
- Case Date:
- 2/12/2024
Why there detour sign on seventh street
- Case Date:
- 5/10/2016
Complains of old furniture that has been left in the parking lot on the south end.
- Case Date:
- 5/10/2016
Complains of old furniture that has been left in the parking lot on the south end.
- Case Date:
- 8/17/2015
Blocked Sidewalk
500 S Hawthorne DR
- Case Date:
- 11/30/2022
Blocked sidewalk: Unkempt overgrowth of 500 S. Hawthorne yard is blocking the Hunter Street sidewalk on SE corner of Hunter and Hawthorne and is blocking wheelchair and stroller accessibility.
- Case Date:
- 10/3/2011
Location of your Problem: 500 S Eastside Drive
Details: Orange cones sitting at the end of the "Hunter foot path" (at the 500 S Eastside end of the path) for more than a month now, after some construction this summer. Can the Street Dept. pick them up?
Contact Info
Name: Stella Hooker
Email: altfluit@yahoo.com
Telephone: 333-7006
- Case Date:
- 8/25/2011
Public Works forwarded the message that mattress out next to building on 9th Street. Reported by Trey Maull (325-6554).
Other
500 E 6th St, Bloomington, IN 47408, USA
- Case Date:
- 2/7/2022
This construction thing I believe to hold a sign is blocking the sidewalk by the handicap space.