Trails
2297-2299 W Tapp Rd, Bloomington, Indiana, 47403
- Case Date:
- 6/14/2019
52.
That's how many vertical and/or horizontal obstructions I counted on the Clear Creek Trail from the Tapp Road trailhead to the Church Lane bridge. 52 points where tree limbs or overgrown bushes are in the way.
Cyclists have to duck. Pedestrians have to weave. It's dangerous and makes sharing the trail tough.
52. Maybe you count differently. Even if it's half or a quarter, that's still 26 or 13 hazards. That's dangerous.
This trail needs cleaned up to allow unfettered access and enjoyment.
- Case Date:
- 1/30/2016
Portapotty at Tapp Rd on the Clear Creek Trail needs TP and is almost full
Trails
Jackson Creek Trail
- Case Date:
- 1/30/2016
Complete muddy mess. Please address this continual problem.
- Case Date:
- 6/19/2017
Tree down south of country club drive on the rails to trails.
- Case Date:
- 7/21/2015
Kay Bull reported that the handle is broken on the bike pump near 7th & the B-Line.
Trails
301 W Country Club DR
- Case Date:
- 6/19/2019
Hello -- where the parking lot and sidewalk end and the Rail Trail begins (at the trailhead on Country Club Drive), there is a growing issue. The height difference between the trail and the sidewalk is becoming a real trip hazard for pedestrians, an accessibility issue for others, and a flat tire waiting to happen for cyclists.
Is there a way to get this fixed up a bit? But please, please, do NOT use giant gravel. The parts of the Rail Trail that were patched with giant gravel are a disaster. Leave the bump instead of using big gravel if that is the only set of options.
Trails
301 W Country Club DR
- Case Date:
- 6/19/2019
This is why we can't have nice things . . . Why is this big gravel on the Rail Trail? The nice, even, soft surface of the trail has something like 3 or 4 sections where this big gravel was tossed on the trail and now it is a real issue. The big gravel is unstable for runners and walkers. The big gravel hurts the pads of dogs. And, the big gravel is a disaster to ride a bicycle across on a commute into downtown. This needs to be repaired with the big gravel gone and smaller gravel to match the existing trail surface used. You wouldn't patch a section of the B-Line with wood planks, so why mess up the rail trail like this?
Trails
301 W Country Club DR
- Case Date:
- 6/19/2019
This photo was taken to exaggerate the issue just a bit by the perspective, but this is an issue. The parking lot on Country Club at the B-Line Trail is getting gnarly with bushes. Is it possible to trip this back?
Trails
Bloomington, Indiana
- Case Date:
- 6/20/2019
Parks and Rec Friends - We appreciated that you put down rock on the Creek's Edge Trail earlier this summer where one of the detention ponds drains. However, this past weekend's rains have washed the bulk of that rock from this crossing. We would appreciate a repair of this issue. Thank you!
Trails
1600-1698 W Gordon Pike, Bloomington, Indiana, 47403
- Case Date:
- 6/25/2019
The trail is totally covered from side to side by a slurry of mud and gravel. This is the Clear Creek Trail. I would give the location as on the Clear Creek Trail between Rockport and That Road, about where Fullerton / Gordon Pike would hit the Clear Creek Trail if it connected through. There is a gravel path that goes from the trail back up the hill towards the east, as a reference point. It is half a mile from Rockport Road on the trail towards That Road.