uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (1437)

closed #154292

Water Utility Problems

Case Date:
7/26/2016

This is in relation to a concern regarding an excavation project on the neighbors property, located at 3720 Brighton avenue. The neighbors project is impacting the run off from a storm drain which runs through his property. He is using the run off from the drain to fill several large ponds he has developed. The ponds are not properly reinforced nor is there a mechanism for controlling their overflow or run off. The result is that after this mornings recent rain, mud and debris are flowing from his property onto an adjoining piece of property owned by an hoa. I called four weeks ago to inquire about a legal permit which I assumed he had for the work. The employee who assisted me found that there was a permit in place for excavation which related to a proposed addition. We have not observed any home construction activities with relation to this excavation.

closed #170325

Website & Web Services Feedback

2701-2799 E 7th St, Bloomington, Indiana, 47408

Case Date:
9/12/2019

need agenda items in the posted in the BZA meeting calendar

closed #172930

Website & Web Services Feedback

311 E Rhorer RD

Case Date:
7/4/2020

Hello, we live in Sherwood Oaks and there is not a safe way to get to the biking trail starting on Rhorer at Walnut Street Pike. People are often walking or biking up the last two blocks of Walnut Street Pike to reach that connection. It's not safe. We'd be so grateful if the sidewalk could be completed on the East Side of Walnut Street Pike between Rhorer and Heather Drive. This would allow people to access Kroger and the Rail Trail more safely. Other wishlist items are paving the rail-trail that connects the B-Line and Clear Creek Trail,and extending sidewalks along Rhorer all the way from Walnut Street Pike to Sare (or at least to Benson). It would also be nice if the sidewalk along the East Side of Walnut Street Pike extended all the way from Rhorer to Winslow, but finishing a sidewalk on the E or W side of Walnut Street Pike between E. Heather and Rhorer is really essential to pedestrian and biker safety. We love all of the investments we're seeing Bloomington making in parks, recreation and infrastructure. We really value this as a family with young children. We're just surprised how patchy the sidewalks surrounding our neighborhood are, with some suddenly stopping (Walnut Street Pike + Rhorer) and others reworked only to a certain point (example biking from Winslow Plaza east to Highland or Allendale is challenging). This makes it difficult to access all of the new paved biking/walking trails that connect to the Rail Trail and B-Line. We hope that COVID-19 does not make continued investments in sidewalks and walking paths impossible. Sincerely, Andrea Nikolova and Dimitar Nikolov 1044 E Jennifer Dr

closed #175469

Website & Web Services Feedback

Case Date:
4/15/2021

"...A Certificate of Appropriateness is required to make any external change to a protected structure in a Local Historic District and to move, demolish or build a new building in a Conservation District".

closed #175809

Website & Web Services Feedback

Case Date:
5/17/2021

Do not close old 37 through casecades park or we are going to vote you out.

closed #173708

Website & Web Services Feedback

Bloomington City Hall

Case Date:
9/14/2020

You asked my husband Ronald to do a 5-year Master Plan Community Survey and he passed in April 2018. And I am not interested in ding the Survey. Thanks

closed #164982

Yard Waste

505 E Allen ST

Case Date:
6/27/2018

The city blocked some section of the road off (presumably to slow traffic). Now there is just yard waste and old hay bails left in them. It looks trashy.