Utilities Construction
2610 Round Hill Ln
- Case Date:
- 7/5/2024
Could the city please finish the water project started during the winter? I scrap my car every time I come out of my driveway. The patch jobs were terrible on all parts of the Spicewood neighborhood.
Utilities Yardwork
403 E 6th ST
- Case Date:
- 6/7/2018
City tree branch fell on property of 403 E. Sixth Street, damaged gutter. Branch needs removal.
- Case Date:
- 8/15/2018
branch hanging from utility line on south east corner of High Street and Moores Pike.
Utilities Yardwork
1307 E Davis ST
- Case Date:
- 8/8/2023
A tree feel from 1307 E Davis Street across the street and is blocking an important drainage area across the street that is extremely important for the downhill run off.
Utility Construction Projects
Walnut & North Drive, Bloomington, IN 47401, USA
- Case Date:
- 2/15/2023
A worker painted on the road at the intersection. The worker was standing on the double lines. I noticed the worker and signaled that I would be negotiating a left turn onto North Drive headed east. The worker walked in front of my vehicle. The worker was unaware of his surroundings, nor had he seemed concerned about using safety equipment, i.e., cones, caution tape, spotters, or hazard lights. I was not traveling at a high rate of speed. However, this could have been a bad traffic accident. I believe the worker's hearing was obstructed as he wore a sweatshirt with a hard hat atop his head.
Utility Construction Projects
- Case Date:
- 10/28/2023
Deep hole in Olive street in front of Zen Center...someone is going to break a leg, and its been there for at least a year
Utility Construction Projects
- Case Date:
- 4/4/2024
There is a large pipe knocked down from the corner of South Rogers Street and Hillside, it is laying on the sidewalk.
Utility Construction Projects
1330 N Crescent RD
- Case Date:
- 11/18/2024
about a 10" inch wide hole that's over a foot deep right in the middle of 17th street. I phoned this into 911 10/20/2024, but nothing has been done.
Utility Construction Projects
415 E First Street
- Case Date:
- 4/15/2025
Utility cut in the road, no warning sign whatsoever.
Utility Construction Projects
415 E First Street
- Case Date:
- 4/17/2025
Case #202092. We appreciate you setting up 2 huge warning signs near the cut, but the first orange square warning is backwards.. Needs to be turned around. The warning is not visible for motorist driving west.