Biking & Walking
400 E 7th ST
- Case Date:
- 2/25/2025
7th st alternate bike route is confusing. aifhn points against one way street. need to mark 7st with more bike designation. also, sewer grates will catch cyclists tires. mees to rotate. tx
Biking & Walking
825 E 8th ST
- Case Date:
- 6/16/2025
I was riding in the Woodlawn bike lane today going south and it was full of rocks and debris. It ended up popping my bike tire. Please keep the bike lanes clean, especially on busy roads like Woodlawn where riding into the road would have gotten me hit by a car.
Biking & Walking
600 N Grant ST
- Case Date:
- 7/26/2025
There is a large amount of sand in the road next to the bicycle shop.
City Construction Projects
414 E Cottage Grove AVE
- Case Date:
- 5/26/2025
Cavity forming alongside water meter in ROW close to SW corner of lot.
Debris Removal (Sand, General Street Debris)
323 E 11th ST
- Case Date:
- 10/1/2024
Street needs cleaned around this street and corner.
Debris Removal (Sand, General Street Debris)
719 N Grant ST
- Case Date:
- 12/7/2024
Leaves and other debris have piled up all along the parking and curb area. Needs to be cleaned up, looks like it’s been years
Debris Removal (Sand, General Street Debris)
207 N Washington ST
- Case Date:
- 7/11/2025
Broken glass in bike lane between 7th and Kirkwood on Washington street
Potholes, Other Street Repair
306 E 11th ST
- Case Date:
- 4/23/2021
CBU utility repair project in street several months ago was never completed. Street is now crumbling.
Potholes, Other Street Repair
401 N Dunn ST
- Case Date:
- 3/14/2024
Near the alley way at 401 N Dunn water does not drain properly and builds up with gravel and dirt making it difficult for handicap travel. 8th Street has been paved over so many times that drainage is impaired. There is quite a bit of debris there now and this holds a lot of water during a rain event. Finally the alley has been patched a little but it is in pretty bad shape and needs redone. Thank you; Dave Kamen
Potholes, Other Street Repair
309 E 7th ST
- Case Date:
- 3/29/2024
I am following up on Ureport # 185950 and work order # 11905.
Regards,
Craig