closed #175537
Potholes, Other Street Repair
306 E 11th ST
- Case Date:
- 4/23/2021
CBU utility repair project in street several months ago was never completed. Street is now crumbling.
CBU utility repair project in street several months ago was never completed. Street is now crumbling.
This building has a water leak in the main supply in the pit in front of the building. It is has been reported by fire inspection company while looking into repair of their line. It is believed to be before the meter and on the city side.
SE corner of lot just west of alley and close to the sidewalk there is a medium-sized, water-meter pit that is uncovered. Lid is not around, apparently. Dangerous trip hazard at night, and animals could fall in.
Near the alley way at 401 N Dunn water does not drain properly and builds up with gravel and dirt making it difficult for handicap travel. 8th Street has been paved over so many times that drainage is impaired. There is quite a bit of debris there now and this holds a lot of water during a rain event. Finally the alley has been patched a little but it is in pretty bad shape and needs redone. Thank you; Dave Kamen
I am following up on Ureport # 185950 and work order # 11905. Regards, Craig
Can you please provide an update on the storm drain repair? the drainage inlet is broken.
There is a "CBU" orange/white-striped horse-type warning sign sitting by the street (12th Street side) that has been there awhile without any apparent reason.
Street needs cleaned around this street and corner.
Leaves and other debris have piled up all along the parking and curb area. Needs to be cleaned up, looks like it’s been years
7th st alternate bike route is confusing. aifhn points against one way street. need to mark 7st with more bike designation. also, sewer grates will catch cyclists tires. mees to rotate. tx