Biking & Walking
825 E 8th ST
- Case Date:
- 6/16/2025
I was riding in the Woodlawn bike lane today going south and it was full of rocks and debris. It ended up popping my bike tire. Please keep the bike lanes clean, especially on busy roads like Woodlawn where riding into the road would have gotten me hit by a car.
Sewer Problems (Storm Sewers)
401 N Sheffield DR
- Case Date:
- 6/18/2025
The drain is covered with down limbs from the storm and asphalt that was brought in by the rainwater. Also. It needs to be further cleared and taken away. If you just dump it up on the curb it will kill all the grass and in the next storm it will fill up the drain again. So please remove this debris! This is a chronic flooding area and the main storm sewer outlet for this part of Park ridge East
Drainage or Runoff
401 N Gates DR
- Case Date:
- 6/18/2025
Small sinkhole roughly 1 foot in diameter has appeared in the drainage ditch area in front of our main production facility. The hole is knee deep but appears to have very soft ground inside. The hole is very close to a fire hydrant, so we aren't sure if its a result of storm drainage/runoff, or if there might be a leak somewhere. We're hoping the City of Bloomington can come out to take a look and advise of next steps.