Excessive Growth
1130 W Sugarberry CT
- Case Date:
- 10/6/2025
On the north end of Ridgefield neighborhood, all along the sidewalk that runs parallel with Kinser, the trees are hanging over the sidewalk. The residents on that end claim it is the city's responsibility. I trimmed it once this spring and am not doing it again. Make these people trim their trees. Basically 1146 thru 1126 W. Sugarberry Court
- Case Date:
- 10/5/2025
There are large stones blocking the sidewalk on the north side of 2nd, a bit west of Wendy’s and also closer to the trail. You wouldn’t leave barriers in the roads. Why do you leave them on sidewalks? Thank you.
Line of Sight
700 1/2 S Highland AVE
- Case Date:
- 10/5/2025
There is a pine tree on the S.W. corner that totally blocks vision when going east on first.
Blocked Sidewalk
3834 E Moores PIKE
- Case Date:
- 10/4/2025
sidewalk is blocked along this stretch in a few places by overgrown bushes and ornamental grass. on the corner, the bushes are the responsibility of whoever owns the utility boxes they hide, along the road it's the houses behind the hedge.
Traffic Suggestions
630 S Morton ST
- Case Date:
- 10/3/2025
The light at 2nd and Patterson needs a longer left turn signal, going from Patterson onto 2nd street. The time of the turn light is way too short. This has been a problem for years. I was the 6th car back in the turn line this morning and had to wait THREE LIGHT CYCLES to even make it through. Please make it a turn signal longer. Thank you!!!!!!!!!!!!!!
Blocked Street
S Rogers St
- Case Date:
- 10/2/2025
On September 29, the road project on 2nd Street near Rogers involved shutting down Rogers just north of 2nd Street. I live in that area, and in order to get to my home, I had to get out of my car twice to move blockages in the road. At the intersection of 3rd and Rogers, there was a barricade that I was able to drive by, but it was barely passable for my car and I had to almost drive up on the curb. Then at the intersection of Howe and 2nd, I had to get out of my car to move construction cones. There were cars going through the intersection and it was dark, so that was not a safe situation. Then when I tried to pull into my drive, there were construction barriers blocking it. I had to get out of my car again and ask a street worker to move it. He was very nice, though. The issue only took place that evening, but I wanted to report it since it was difficult and dangerous.
Traffic Related Complaints
College Ave, 10th and 11th St stoplight synchronization
- Case Date:
- 10/2/2025
Stoplights not synched
Traffic Suggestions
4315 E 3rd St
- Case Date:
- 10/1/2025
I witnessed a woman get struck by a pickup truck today at E 3rd and Morningside. This was an accident waiting to happen, as pedestrians and bicyclists on E 3rd Street are constantly risking their lives to cross it. The distance from the crosswalk at Smith Rd to the traffic light at SR 446 is 0.5 miles. (Note, there are also ZERO pedestrian crossing marks at the very busy intersection of 3rd & 446, where people with kids cross to get to Bruester's Ice Creamery.) HUNDREDS of rental units have been built on both sides of 3rd between Park Ridge and 446. A SAFE crossing should be added, with flashers or center island at Park Ridge or Morningside, or a traffic light should be placed at 3rd and Park Ridge.
Traffic Suggestions
1428 S Washington ST
- Case Date:
- 9/30/2025
Westbound traffic on E Hillside congests at the S Walnut and E Hillside traffic light, which often causes backups and results in traffic blocking the E Hillside and S Washington intersection. Can there be a “do not block intersection” or one of the roadway painted Xs placed at that intersection? This has happened to me numerous times, and I get frustrated and honk, and E Hillside drivers either ignore me, or give me a mean look like this was my fault when they’re blocking the roadway.
Blocked Street
403 W 2nd ST
- Case Date:
- 9/29/2025
Overnight Road Construction at 2nd and Rogers is extremely disruptive to neighbors. Large machinery (jackhammers, trucks with very loud backup signals, etc.) can be heard all hours of the night (most notably around 2:45 am this morning). When there has been construction near Hopewell in the past, the construction team saved "noisy" activities for daylight hours. For whatever reason, that has not been the case for the past week or so.